When does post-demolition vacancy become persistent, and how much vacant land remains? Nationwide evidence from South Korea

Vacant-land inventories show where parcels remain vacant, but not how long they have remained without built reuse after demolition. Using nationwide administrative histories of 435,702 demolished parcels in South Korea (2005–2024), we link demolition dates to subsequent occupancy approvals and estimate Kaplan–Meier still-vacant curves. We identify when these curves enter a sustained period of slow decline, yielding two measures: stabilization time (ST), when the slowdown begins, and stabilization survival (SS), the share remaining without registered built reuse at that point. Under the main three-year persistence criterion, the pooled national curve reaches this phase 1055 days after demolition, with an estimated still-vacant share of 56.4%. Among parcels without observed registered built reuse at the end of 2024, 29% had elapsed durations shorter than this benchmark. Across 1148 neighborhoods, similar ST values can correspond to different SS values, and vice versa. Neighborhood and municipal conditions are more systematically associated with SS than with ST. These findings show that the timing of slowing reuse and the amount of vacancy remaining capture different aspects of post-demolition change.

Authors

Institutions

Publication Details

Journal
Environment and Planning B Urban Analytics and City Science
Published
2026-11-14
DOI
https://doi.org/10.1177/23998083261507758
Primary Topic
Urbanization and City Planning
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

When does post-demolition vacancy become persistent, and how much vacant land remains? Nationwide evidence from South Korea

Bumjoon Kang, Sunjae Lee, Minju Shin
Environment and Planning B Urban Analytics and City Science
Urbanization and City Planning
article

When does post-demolition vacancy become persistent, and how much vacant land remains? Nationwide evidence from South Korea

Bumjoon Kang, Sunjae Lee, Minju Shin
article en

Abstract

Vacant-land inventories show where parcels remain vacant, but not how long they have remained without built reuse after demolition. Using nationwide administrative histories of 435,702 demolished parcels in South Korea (2005–2024), we link demolition dates to subsequent occupancy approvals and estimate Kaplan–Meier still-vacant curves. We identify when these curves enter a sustained period of slow decline, yielding two measures: stabilization time (ST), when the slowdown begins, and stabilization survival (SS), the share remaining without registered built reuse at that point. Under the main three-year persistence criterion, the pooled national curve reaches this phase 1055 days after demolition, with an estimated still-vacant share of 56.4%. Among parcels without observed registered built reuse at the end of 2024, 29% had elapsed durations shorter than this benchmark. Across 1148 neighborhoods, similar ST values can correspond to different SS values, and vice versa. Neighborhood and municipal conditions are more systematically associated with SS than with ST. These findings show that the timing of slowing reuse and the amount of vacancy remaining capture different aspects of post-demolition change.

Environment and Planning B Urban Analytics and City Science
Seoul National University (KR), The University of Tokyo (JP)
Urbanization and City Planning
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon