When does post-demolition vacancy become persistent, and how much vacant land remains? Nationwide evidence from South Korea
Vacant-land inventories show where parcels remain vacant, but not how long they have remained without built reuse after demolition. Using nationwide administrative histories of 435,702 demolished parcels in South Korea (2005–2024), we link demolition dates to subsequent occupancy approvals and estimate Kaplan–Meier still-vacant curves. We identify when these curves enter a sustained period of slow decline, yielding two measures: stabilization time (ST), when the slowdown begins, and stabilization survival (SS), the share remaining without registered built reuse at that point. Under the main three-year persistence criterion, the pooled national curve reaches this phase 1055 days after demolition, with an estimated still-vacant share of 56.4%. Among parcels without observed registered built reuse at the end of 2024, 29% had elapsed durations shorter than this benchmark. Across 1148 neighborhoods, similar ST values can correspond to different SS values, and vice versa. Neighborhood and municipal conditions are more systematically associated with SS than with ST. These findings show that the timing of slowing reuse and the amount of vacancy remaining capture different aspects of post-demolition change.
Authors
- Bumjoon Kang (ORCID: https://orcid.org/0000-0002-8551-7652)
- Sunjae Lee (ORCID: https://orcid.org/0000-0003-0083-5369)
- Minju Shin (ORCID: https://orcid.org/0009-0002-4646-1868)
Institutions
- Seoul National University (KR)
- The University of Tokyo (JP)
Publication Details
- Journal
- Environment and Planning B Urban Analytics and City Science
- Published
- 2026-11-14
- DOI
- https://doi.org/10.1177/23998083261507758
- Primary Topic
- Urbanization and City Planning
- Type
- article
- Field-Weighted Citation Impact
- 0.00