Smart Cities, Slow Institutions: Implementation Gaps in India’s Smart Cities Mission—A Case Study of Sub-national Urban Governance
India’s Smart Cities Mission (SCM), launched in June 2015 to upgrade governance and infrastructure in 100 cities through technology-enabled, citizen-centric planning, formally concluded on 31 March 2025. Its record is uneven: Cities completed about 93% of the 8,063 projects undertaken, yet the institutional architecture meant to sustain these gains—collaborative governance between elected municipal bodies and special-purpose vehicles (SPVs), predictable inter-governmental financing and genuine citizen participation—lagged behind the physical infrastructure. Using a qualitative case-study method and secondary documentary evidence, this article traces three bottlenecks: fragmented authority between SPVs and urban local bodies; fiscal federalism frictions between central ambition and state/municipal capacity; and a participation deficit in which technology substituted for citizen voice. Evidence from Ahmedabad, Bhubaneswar and Dharamshala shows how SPVs and integrated command and control centres worked in a large corporation, a mid-sized state capital and a small hill town, and that delivery was most complete where municipal capacity was strongest. The Mission treated urban transformation as a project-management rather than an institutional task. The article concludes with fiscal, systemic and institutional reforms, with feedback for AMRUT 2.0 and the Urban Challenge Fund.
Authors
- Ishaan Arora
Institutions
- National Institute of Construction Management and Research (IN)
Publication Details
- Journal
- Indian Journal of Public Administration
- Published
- 2026-11-13
- DOI
- https://doi.org/10.1177/00195561261503741
- Primary Topic
- Smart Cities and Technologies
- Type
- article
- Field-Weighted Citation Impact
- 0.00