Pareto optimization of BEMU traction battery capacity and recharging infrastructure

Abstract The increasing integration of the energy and transport sectors requires efficient solutions for electrifying rail networks. Battery-powered trains (battery electric multiple units - BEMUs) offer a promising alternative to full electrification, but their range is limited by the current state of battery technology and recharging infrastructure. This study presents an optimization model that simultaneously optimizes the recharging infrastructure and traction batteries of the trains, enabling a system design based on BEMU power demand and timetable data. The model considers various factors, including route topology, timetable, charging infrastructure, and battery aging. A case study of a non-electrified mountain line considering two combinations of optimization targets and a case study for a long-distance line with partial electrification demonstrate the flexibility of the model and its applicability for different optimization tasks. The optimization results provide insights into the optimal dimensioning of charging infrastructure and batteries, considering factors such as heating ventilation and air conditioning (HVAC) demand, end-of-life capacity, discrete power of charging infrastructure, and battery replacement. Pareto-optimal system configurations are determined on the basis of stakeholder annuities (BEMU vs. electrification) and annuities versus minimal capacity buffer of the traction battery. Results indicate that Pareto-optimal BEMU annuities for the mountain line range from 1.27 to 1.31 mil€/a, whereas electrification annuities range from 0.50 to 1.36 mil€/a. This emphasizes designing systems for low electrification costs rather than low BEMU costs. The energy buffer of the traction batteries were increased by 37.2% by increasing the total annuity by 1.5%. A sensitivity analysis regarding parameters that define the Pareto front is conducted, which shows a shift in the Pareto fronts as a function of the sensitive parameters.

Authors

Institutions

Publication Details

Journal
Energy Informatics
Published
2026-11-14
DOI
https://doi.org/10.1186/s42162-026-00709-7
Primary Topic
Railway Systems and Energy Efficiency
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Pareto optimization of BEMU traction battery capacity and recharging infrastructure

Lukas Schork, Anastasia Dushina, Stefan Arens, Christoph Streuling et al.
Energy Informatics
Railway Systems and Energy Efficiency
article

Pareto optimization of BEMU traction battery capacity and recharging infrastructure

Lukas Schork, Anastasia Dushina, Stefan Arens, Christoph Streuling, Moritz Schenker, Peter Klement, John Selbig
article en

Abstract

Abstract The increasing integration of the energy and transport sectors requires efficient solutions for electrifying rail networks. Battery-powered trains (battery electric multiple units - BEMUs) offer a promising alternative to full electrification, but their range is limited by the current state of battery technology and recharging infrastructure. This study presents an optimization model that simultaneously optimizes the recharging infrastructure and traction batteries of the trains, enabling a system design based on BEMU power demand and timetable data. The model considers various factors, including route topology, timetable, charging infrastructure, and battery aging. A case study of a non-electrified mountain line considering two combinations of optimization targets and a case study for a long-distance line with partial electrification demonstrate the flexibility of the model and its applicability for different optimization tasks. The optimization results provide insights into the optimal dimensioning of charging infrastructure and batteries, considering factors such as heating ventilation and air conditioning (HVAC) demand, end-of-life capacity, discrete power of charging infrastructure, and battery replacement. Pareto-optimal system configurations are determined on the basis of stakeholder annuities (BEMU vs. electrification) and annuities versus minimal capacity buffer of the traction battery. Results indicate that Pareto-optimal BEMU annuities for the mountain line range from 1.27 to 1.31 mil€/a, whereas electrification annuities range from 0.50 to 1.36 mil€/a. This emphasizes designing systems for low electrification costs rather than low BEMU costs. The energy buffer of the traction batteries were increased by 37.2% by increasing the total annuity by 1.5%. A sensitivity analysis regarding parameters that define the Pareto front is conducted, which shows a shift in the Pareto fronts as a function of the sensitive parameters.

Energy Informatics
Carl von Ossietzky Universität Oldenburg (DE)
Railway Systems and Energy Efficiency
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon