Team trust and shared responsibility as predictors of equitable hands-on participation in electrical machines project teams

Project-based electrical engineering courses require students not only to complete a functioning technical product but also to distribute meaningful practical-learning opportunities among team members. This quantitative cross-sectional study examined whether team trust and shared responsibility predicted equitable hands-on participation in Electrical Machines project teams. Participants were 47 fourth-semester students aged 20–24 years (M = 21.83, SD = 1.19), comprising 38 men and nine women, organized into 12 project teams at Universitas Negeri Yogyakarta, Indonesia. Data were collected using the 21-item Team Trust Scale, the eight-item Shared Responsibility subscale, and an eight-item context-specific Equitable Hands-On Participation Scale. The measures demonstrated good-to-excellent internal consistency, with Cronbach’s alpha coefficients of .945, .837, and .856, respectively. Team trust (M = 5.17, SD = 0.47) and shared responsibility (M = 4.16, SD = 0.45) were strongly associated with equitable hands-on participation (M = 4.16, SD = 0.48), with correlations of r = .976 and r = .987, respectively (p < .001). The regression model explained 97.5% of the variance in equitable participation. Using team-clustered standard errors, shared responsibility emerged as a significant unique predictor (β = .846, p = .002), whereas team trust did not contribute significant unique variance after shared responsibility was controlled (β = .143, p = .515). The findings suggest that trust may provide a relational foundation for collaborative practice, but shared responsibility is more directly associated with the distribution of hands-on learning opportunities. Because of severe multicollinearity, strong within-team clustering, and the single-source cross-sectional design, the results should be interpreted as exploratory.

Authors

Institutions

Publication Details

Journal
Interpersona An International Journal on Personal Relationships
Published
2026-11-14
DOI
https://doi.org/10.54899/iij.v20i4.1351
Primary Topic
Problem and Project Based Learning
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Team trust and shared responsibility as predictors of equitable hands-on participation in electrical machines project teams

Andik Asmara, Nur Kholis, Sukir
2 links
Interpersona An International Journal on Personal Relationships
Problem and Project Based Learning
article

Team trust and shared responsibility as predictors of equitable hands-on participation in electrical machines project teams

Andik Asmara, Nur Kholis, Sukir
article en

Abstract

Project-based electrical engineering courses require students not only to complete a functioning technical product but also to distribute meaningful practical-learning opportunities among team members. This quantitative cross-sectional study examined whether team trust and shared responsibility predicted equitable hands-on participation in Electrical Machines project teams. Participants were 47 fourth-semester students aged 20–24 years (M = 21.83, SD = 1.19), comprising 38 men and nine women, organized into 12 project teams at Universitas Negeri Yogyakarta, Indonesia. Data were collected using the 21-item Team Trust Scale, the eight-item Shared Responsibility subscale, and an eight-item context-specific Equitable Hands-On Participation Scale. The measures demonstrated good-to-excellent internal consistency, with Cronbach’s alpha coefficients of .945, .837, and .856, respectively. Team trust (M = 5.17, SD = 0.47) and shared responsibility (M = 4.16, SD = 0.45) were strongly associated with equitable hands-on participation (M = 4.16, SD = 0.48), with correlations of r = .976 and r = .987, respectively (p < .001). The regression model explained 97.5% of the variance in equitable participation. Using team-clustered standard errors, shared responsibility emerged as a significant unique predictor (β = .846, p = .002), whereas team trust did not contribute significant unique variance after shared responsibility was controlled (β = .143, p = .515). The findings suggest that trust may provide a relational foundation for collaborative practice, but shared responsibility is more directly associated with the distribution of hands-on learning opportunities. Because of severe multicollinearity, strong within-team clustering, and the single-source cross-sectional design, the results should be interpreted as exploratory.

Interpersona An International Journal on Personal RelationshipsVol. 20(4)
Yogyakarta State University (ID)
Quality education
Problem and Project Based Learning
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon