COMPARATIVE ANALYSIS OF QUANTITY TAKE OFF CALCULATIONS FOR STRUCTURAL WORK USING BIM AND CONVENTIONAL METHODS

Quantity Take Off (QTO) accuracy is essential for effective material estimation and project cost control, particularly for pilecap structures with complex reinforcement configurations. This study compares the accuracy of reinforcement and concrete quantities, as well as processing time, between Building Information Modeling (BIM) and conventional QTO methods using three categories of pilecap in the Solo-Yogyakarta-NYIA Kulon Progo Toll Road Project, Package 2.2B Trihanggo-Junction Sleman (STA 54+635 to STA 57+839). The BIM based method employed Autodesk Revit for three dimensional modeling and automatic quantity extraction, while the conventional method used AutoCAD and Microsoft Excel for manual calculations. The results revealed minimal differences in reinforcement (0.677%) and concrete volume (0.014%), indicating a very high level of agreement between both methods. However, the BIM based method required substantially longer processing time due to the additional three dimensional modeling process. These findings indicate that the primary distinction between the two methods lies in the QTO preparation process rather than the resulting material quantities.

Authors

Publication Details

Journal
International Journal of Sustainable Building Infrastructure and Environment (IJOSBIE)
Published
2026-11-14
DOI
https://doi.org/10.26877/ijosbie.v7i2.1183
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

COMPARATIVE ANALYSIS OF QUANTITY TAKE OFF CALCULATIONS FOR STRUCTURAL WORK USING BIM AND CONVENTIONAL METHODS

Lintang Enggartiasto, Agung Kristiawan, Ahmad Qohhar, Pramananda Nayaka Wijaya
International Journal of Sustainable Building Infrastructure and Environment (IJOSBIE)
BIM and Construction Integration
article

COMPARATIVE ANALYSIS OF QUANTITY TAKE OFF CALCULATIONS FOR STRUCTURAL WORK USING BIM AND CONVENTIONAL METHODS

Lintang Enggartiasto, Agung Kristiawan, Ahmad Qohhar, Pramananda Nayaka Wijaya
article en

Abstract

Quantity Take Off (QTO) accuracy is essential for effective material estimation and project cost control, particularly for pilecap structures with complex reinforcement configurations. This study compares the accuracy of reinforcement and concrete quantities, as well as processing time, between Building Information Modeling (BIM) and conventional QTO methods using three categories of pilecap in the Solo-Yogyakarta-NYIA Kulon Progo Toll Road Project, Package 2.2B Trihanggo-Junction Sleman (STA 54+635 to STA 57+839). The BIM based method employed Autodesk Revit for three dimensional modeling and automatic quantity extraction, while the conventional method used AutoCAD and Microsoft Excel for manual calculations. The results revealed minimal differences in reinforcement (0.677%) and concrete volume (0.014%), indicating a very high level of agreement between both methods. However, the BIM based method required substantially longer processing time due to the additional three dimensional modeling process. These findings indicate that the primary distinction between the two methods lies in the QTO preparation process rather than the resulting material quantities.

International Journal of Sustainable Building Infrastructure and Environment (IJOSBIE)Vol. 7(2)
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon