Integrating Power and Connectivity: Feasibility Assessment and Digital Platform Design for EV Charging Infrastructure

Reliable electric-vehicle charging requires reservations to reflect deliverable power and energy, not only vacant connectors. This study develops a planning framework for a hub comprising two 120 kW DC chargers, two 22 kW AC chargers, 25 kWp photovoltaics, 50 kWh storage and a 250 kVA transformer. A descriptive survey of 100 respondents is combined with transparent, illustrative operating-envelope calculations. Station scarcity and waiting times accounted for 38% and 29% of reported hesitations; 55% definitely favoured pre-booking. Under assumed power factor and DC efficiency of 0.95, 44 kW AC demand and 5 kW auxiliary load, full charging requires 301.6 kW against a 237.5 kW grid ceiling. Without solar or storage support, combined DC output is limited to 179.1 kW. At 20 kW solar output, full charging requires 44.1 kW battery discharge; an assumed 38 kWh deliverable storage budget supports approximately 51.7 minutes. The analysis motivates reservation admission checks for equipment status, power allocation and cumulative energy. These are conditional planning results, not field validation. Unverified survey provenance, missing load profiles and absent cost data preclude claims of queue reduction, renewable-energy share or investment payback.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-15
DOI
https://doi.org/10.5281/zenodo.24231784
Primary Topic
Electric Vehicles and Infrastructure
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Integrating Power and Connectivity: Feasibility Assessment and Digital Platform Design for EV Charging Infrastructure

Abhijith VR, Newby Koshy, Karthikeyan V. G., Akhil Satheesh, Lyon Yesudas, S Sarath
Zenodo (CERN European Organization for Nuclear Research)
Electric Vehicles and Infrastructure
article

Integrating Power and Connectivity: Feasibility Assessment and Digital Platform Design for EV Charging Infrastructure

Abhijith VR, Newby Koshy, Karthikeyan V. G., Akhil Satheesh, Lyon Yesudas, S Sarath
article en

Abstract

Reliable electric-vehicle charging requires reservations to reflect deliverable power and energy, not only vacant connectors. This study develops a planning framework for a hub comprising two 120 kW DC chargers, two 22 kW AC chargers, 25 kWp photovoltaics, 50 kWh storage and a 250 kVA transformer. A descriptive survey of 100 respondents is combined with transparent, illustrative operating-envelope calculations. Station scarcity and waiting times accounted for 38% and 29% of reported hesitations; 55% definitely favoured pre-booking. Under assumed power factor and DC efficiency of 0.95, 44 kW AC demand and 5 kW auxiliary load, full charging requires 301.6 kW against a 237.5 kW grid ceiling. Without solar or storage support, combined DC output is limited to 179.1 kW. At 20 kW solar output, full charging requires 44.1 kW battery discharge; an assumed 38 kWh deliverable storage budget supports approximately 51.7 minutes. The analysis motivates reservation admission checks for equipment status, power allocation and cumulative energy. These are conditional planning results, not field validation. Unverified survey provenance, missing load profiles and absent cost data preclude claims of queue reduction, renewable-energy share or investment payback.

Zenodo (CERN European Organization for Nuclear Research)
Electric Vehicles and Infrastructure
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon