Integrating Power and Connectivity: Feasibility Assessment and Digital Platform Design for EV Charging Infrastructure
Reliable electric-vehicle charging requires reservations to reflect deliverable power and energy, not only vacant connectors. This study develops a planning framework for a hub comprising two 120 kW DC chargers, two 22 kW AC chargers, 25 kWp photovoltaics, 50 kWh storage and a 250 kVA transformer. A descriptive survey of 100 respondents is combined with transparent, illustrative operating-envelope calculations. Station scarcity and waiting times accounted for 38% and 29% of reported hesitations; 55% definitely favoured pre-booking. Under assumed power factor and DC efficiency of 0.95, 44 kW AC demand and 5 kW auxiliary load, full charging requires 301.6 kW against a 237.5 kW grid ceiling. Without solar or storage support, combined DC output is limited to 179.1 kW. At 20 kW solar output, full charging requires 44.1 kW battery discharge; an assumed 38 kWh deliverable storage budget supports approximately 51.7 minutes. The analysis motivates reservation admission checks for equipment status, power allocation and cumulative energy. These are conditional planning results, not field validation. Unverified survey provenance, missing load profiles and absent cost data preclude claims of queue reduction, renewable-energy share or investment payback.
Authors
- Abhijith VR, Newby Koshy, Karthikeyan V. G., Akhil Satheesh, Lyon Yesudas, S Sarath
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-15
- DOI
- https://doi.org/10.5281/zenodo.24231784
- Primary Topic
- Electric Vehicles and Infrastructure
- Type
- article
- Field-Weighted Citation Impact
- 0.00