The Mekong Delta Budget: Dam-Era Load Reduction Against Subsidence and Sand Demand
This paper computes a fluvial sediment budget for the Mekong River and its Vietnamese delta, using published gauging records as inputs and standard relations stated in full. The principal computed quantities are: accretion baseline mm per yr = 2.857; accretion scenario mm per yr = 1.339; required load Mt per yr = 336; load reduction pct = 53.12; baseline supply over required ratio = 0.4762. Each value is derived in the deposited code from the stated inputs, so the budget can be re-run with alternative published values. The results place this system quantitatively alongside other gauged rivers and deltas treated with the same relations, and the discussion identifies which input dominates the uncertainty of each headline number. Computed from stated assumptions and published data, not a new measurement.
Authors
- William Alexander Aldred (ORCID: https://orcid.org/0009-0000-1215-577X)
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-15
- DOI
- https://doi.org/10.5281/zenodo.24234607
- Primary Topic
- Hydrology and Sediment Transport Processes
- Type
- article
- Field-Weighted Citation Impact
- 0.00