Analysis of Causes and Risk Mitigation for Delivery Delays Based on On-Time In-Full (OTIF) Data in Non-Cement Distribution Using RCA and FMEA Methods at PT XYZ
Delivery punctuality is an important indicator of logistics service performance, yet non-cement distribution at PT XYZ still experiences delays. On Time In Full (OTIF) data from May to July 2026 recorded that only 54.64% of 14,986 shipments were delivered on time. This study aims to determine the on-time delivery rate, identify the dominant causes and root causes of delay, and determine mitigation priorities. The methods used were Pareto diagram, Root Cause Analysis (RCA) with fishbone and 5 Why, and Failure Mode and Effect Analysis (FMEA), with Severity, Occurrence, and Detection rated by two respondents. The Pareto results show that long parking time (49.9%) and unloading schedule (41.1%) caused 91.0% of the delays. RCA identified the root causes as the absence of a standard maximum stopping time, a joint arrival scheduling mechanism with receivers, a procedure for communicating estimated arrival, and a cargo readiness confirmation procedure. Based on FMEA, the highest Risk Priority Number (RPN) belongs to the absence of a joint arrival scheduling mechanism with receivers (336), followed by the absence of an estimated arrival notification procedure (168) and a standard maximum stopping time (120). Joint arrival scheduling with receivers should be the priority for improvement.
Authors
- Akhmad Wasiur Rizqi
- Rifki Putra Rahmadhan
Institutions
- Universitas Muhammadiyah Gresik (ID)
- Universitas Gresik (ID)
Publication Details
- Journal
- International Journal Of Science Technology & Management
- Published
- 2026-11-14
- DOI
- https://doi.org/10.46729/ijstm.v7i6.1522
- Primary Topic
- Business Logistics and Inventory Control
- Type
- article
- Field-Weighted Citation Impact
- 0.00