Design Blueprint: Binary Organic Rankine Geothermal Power at Moderate Temperature: Evaporator Pinch, Cycle Efficiency and Heat-Exchanger Budgets

Design blueprint derived from the source paper (DOI 10.5281/zenodo.24234864): This paper presents a computed design study of a geothermal energy system on a single stated operating principle: the geothermal brine never enters the turbine: it heats a secondary organic working fluid in a heat exchanger, the organic vapour drives the turbine in a closed Rankine loop, and the brine leaves for reinjection having touched nothing but pipe walls — so moderate-temperature resources that cannot flash usefully can still generate. The system is a brine supply of 110 kilograms per second at 165 degrees Celsius, cooled to a reinjection temperature of 75 degrees Celsius across the evaporator and preheater of an organic Rankine unit with a 10 kelvin evaporator pinch and air-cooled condensing at 35 degrees Celsius. The design target is net electrical output from the computed cycle efficiency — a stated fraction of the Carnot efficiency between the evaporation and condensing temperatures — with heat-exchanger area from the log-mean temperature difference of the brine glide. The net electrical output is 5.5 megawatts from a produced flow of 110 kilograms per second, a net conversion efficiency of 13.3 percent of the extracted thermal power of 41.5 megawatts, and an annual electricity production of 43.4 gigawatt-hours at the stated capacity factor. This is a computed study with a civilian energy purpose and no targeting or weapon application. The system exists on paper to supply electricity or useful heat to civilian users, and every budget in it — reservoir, flow, conversion, exchanger — is an energy budget. All figures are simulated from the stated assumptions, not measured. Status: DESIGN BLUEPRINT — SIMULATED, NOT MEASURED — NOT BUILT. All numbers are simulated values from the source paper's computation, deposited with this blueprint as compute.py and results.json. The design is a civilian geothermal energy system and has no targeting or weapon application. AI-use disclosure: Dave, an AI research system, assisted with the computation and drafting under the author's direction; author of record William Alexander Aldred.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-15
DOI
https://doi.org/10.5281/zenodo.24235305
Primary Topic
Thermodynamic and Exergetic Analyses of Power and Cooling Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Design Blueprint: Binary Organic Rankine Geothermal Power at Moderate Temperature: Evaporator Pinch, Cycle Efficiency and Heat-Exchanger Budgets

William Alexander Aldred
Zenodo (CERN European Organization for Nuclear Research)
Thermodynamic and Exergetic Analyses of Power and Cooling Systems
article

Design Blueprint: Binary Organic Rankine Geothermal Power at Moderate Temperature: Evaporator Pinch, Cycle Efficiency and Heat-Exchanger Budgets

William Alexander Aldred
article en

Abstract

Design blueprint derived from the source paper (DOI 10.5281/zenodo.24234864): This paper presents a computed design study of a geothermal energy system on a single stated operating principle: the geothermal brine never enters the turbine: it heats a secondary organic working fluid in a heat exchanger, the organic vapour drives the turbine in a closed Rankine loop, and the brine leaves for reinjection having touched nothing but pipe walls — so moderate-temperature resources that cannot flash usefully can still generate. The system is a brine supply of 110 kilograms per second at 165 degrees Celsius, cooled to a reinjection temperature of 75 degrees Celsius across the evaporator and preheater of an organic Rankine unit with a 10 kelvin evaporator pinch and air-cooled condensing at 35 degrees Celsius. The design target is net electrical output from the computed cycle efficiency — a stated fraction of the Carnot efficiency between the evaporation and condensing temperatures — with heat-exchanger area from the log-mean temperature difference of the brine glide. The net electrical output is 5.5 megawatts from a produced flow of 110 kilograms per second, a net conversion efficiency of 13.3 percent of the extracted thermal power of 41.5 megawatts, and an annual electricity production of 43.4 gigawatt-hours at the stated capacity factor. This is a computed study with a civilian energy purpose and no targeting or weapon application. The system exists on paper to supply electricity or useful heat to civilian users, and every budget in it — reservoir, flow, conversion, exchanger — is an energy budget. All figures are simulated from the stated assumptions, not measured. Status: DESIGN BLUEPRINT — SIMULATED, NOT MEASURED — NOT BUILT. All numbers are simulated values from the source paper's computation, deposited with this blueprint as compute.py and results.json. The design is a civilian geothermal energy system and has no targeting or weapon application. AI-use disclosure: Dave, an AI research system, assisted with the computation and drafting under the author's direction; author of record William Alexander Aldred.

Zenodo (CERN European Organization for Nuclear Research)
Thermodynamic and Exergetic Analyses of Power and Cooling Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon