Near-Miss-Informed Occupational Safety Risk Assessment of Upper-Structure Construction Using HIRARC Method
Near-miss observations can reveal hazards that require attention before construction accidents occur. This study assessed upper-structure work at a building construction project in Indonesia using the Hazard Identification, Risk Assessment, and Risk Control (HIRARC) method. Observations, interviews, job safety analysis, expert review, and questionnaires completed by 31 project personnel were used to identify and assess hazards. Twenty-one indicators were retained for analysis. The reported Cronbach’s alpha values were 0.955 for likelihood and 0.967 for severity. Eight indicators obtained a risk score of 6, while thirteen indicators obtained a score of 4, all were classified as low-to-medium risk according to the project risk matrix. The higher-scoring indicators involved sharp materials, scaffolding, material handling, reinforcement fabrication, and access conditions. Engineering controls, task-specific supervision, housekeeping, and appropriate personal protective equipment were proposed. The assessment supports local risk-control prioritization, although perception-based severity ratings and the absence of before-and-after measurements limit conclusions regarding accident reduction.
Authors
- Mirnayani Mirnayani (ORCID: https://orcid.org/0009-0005-2386-2644)
- Daffa Rifky Fadhilah
Institutions
- Mercu Buana University (ID)
Publication Details
- Journal
- International Journal of Sustainable Building Infrastructure and Environment (IJOSBIE)
- Published
- 2026-11-14
- DOI
- https://doi.org/10.26877/ijosbie.v7i2.1365
- Primary Topic
- Occupational Health and Safety Research
- Type
- article
- Field-Weighted Citation Impact
- 0.00