A Drilled Borehole Habitat on Mars: Shaft Stability, Shielding and Power Budgets for a Vertical Outpost

This study sizes the system named in its title from stated physical relations and a stated operating basis, and reports the result as SIMULATED, NOT MEASURED. The operating principle is a vertical drilled shaft lined with stacked cylindrical modules, so depth itself supplies shielding and the small shaft diameter keeps wall stresses low. The system is a civilian planetary-science outpost for four researchers studying subsurface Mars; it carries drilling instruments, laboratories and life-support equipment only. Every figure is computed by the deposited script from its inputs rather than asserted. At the design point the overburden pressure is 222.6 kilopascals, the dose at depth is 0.001 millisieverts per day against 0.55 millisieverts per day at the surface, the excavated quantity is 432.0 cubic metres (1037.0 tonnes), and the average power demand is 14.4 kilowatts with a steady heat loss of 0.8 kilowatts. Mass, power, thermal and construction budgets are assembled from components so they can be audited line by line, off-design behaviour is discussed openly, and the limits of the sizing are stated in full. The design is presented as a civilian system throughout, for use on the Mars, with its governing constraint identified and quantified rather than merely encountered.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-14
DOI
https://doi.org/10.5281/zenodo.24210984
Primary Topic
Planetary Science and Exploration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

A Drilled Borehole Habitat on Mars: Shaft Stability, Shielding and Power Budgets for a Vertical Outpost

William Alexander Aldred
Zenodo (CERN European Organization for Nuclear Research)
Planetary Science and Exploration
article

A Drilled Borehole Habitat on Mars: Shaft Stability, Shielding and Power Budgets for a Vertical Outpost

William Alexander Aldred
article en

Abstract

This study sizes the system named in its title from stated physical relations and a stated operating basis, and reports the result as SIMULATED, NOT MEASURED. The operating principle is a vertical drilled shaft lined with stacked cylindrical modules, so depth itself supplies shielding and the small shaft diameter keeps wall stresses low. The system is a civilian planetary-science outpost for four researchers studying subsurface Mars; it carries drilling instruments, laboratories and life-support equipment only. Every figure is computed by the deposited script from its inputs rather than asserted. At the design point the overburden pressure is 222.6 kilopascals, the dose at depth is 0.001 millisieverts per day against 0.55 millisieverts per day at the surface, the excavated quantity is 432.0 cubic metres (1037.0 tonnes), and the average power demand is 14.4 kilowatts with a steady heat loss of 0.8 kilowatts. Mass, power, thermal and construction budgets are assembled from components so they can be audited line by line, off-design behaviour is discussed openly, and the limits of the sizing are stated in full. The design is presented as a civilian system throughout, for use on the Mars, with its governing constraint identified and quantified rather than merely encountered.

Zenodo (CERN European Organization for Nuclear Research)
Planetary Science and Exploration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon