Concrete Quality Index: A Metric For Assessing Quality Assurance In Construction Practices

This paper proposes a Concrete Quality Index (CQI) for rating how well quality assurance is practised during concreting. Thirty-seven quality parameters were drawn from the literature. Forty-five professionals rated them on a five-point scale, and the ratings were converted into Relative Importance Index (RII) and Weighted Relative Importance Index (WRII) values. On two building sites, each parameter was scored as complied, partly complied or not complied (Quality Control Score, QCS), and QCS times WRII gave a parameter index (QIP) that was summed into the CQI. Site 2 scored 87.34 and Site 1 scored 75.71. Checks made against the drawings and the design grade before a pour carried the greatest weight, while the gap between the sites came mainly from execution items such as vibration, record keeping and the start of curing. The CQI offers site teams a simple, repeatable check on their quality control

Authors

Publication Details

Journal
Kufa Journal of Engineering
Published
2026-11-14
DOI
https://doi.org/10.30572/2018/kje/170420
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Concrete Quality Index: A Metric For Assessing Quality Assurance In Construction Practices

Shruti S. Wadalkar, Priti Satarkar, Venushree Khanke, SupriyaKiran Nalawade et al.
Kufa Journal of Engineering
Construction Project Management and Performance
article

Concrete Quality Index: A Metric For Assessing Quality Assurance In Construction Practices

Shruti S. Wadalkar, Priti Satarkar, Venushree Khanke, SupriyaKiran Nalawade, Choon Kit Chan, Prasad D. Kulkarni
article en

Abstract

This paper proposes a Concrete Quality Index (CQI) for rating how well quality assurance is practised during concreting. Thirty-seven quality parameters were drawn from the literature. Forty-five professionals rated them on a five-point scale, and the ratings were converted into Relative Importance Index (RII) and Weighted Relative Importance Index (WRII) values. On two building sites, each parameter was scored as complied, partly complied or not complied (Quality Control Score, QCS), and QCS times WRII gave a parameter index (QIP) that was summed into the CQI. Site 2 scored 87.34 and Site 1 scored 75.71. Checks made against the drawings and the design grade before a pour carried the greatest weight, while the gap between the sites came mainly from execution items such as vibration, record keeping and the start of curing. The CQI offers site teams a simple, repeatable check on their quality control

Kufa Journal of EngineeringVol. 17(4)
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon