A Practical Approach to Comprehensive Performance Evaluation, Heat Rate Gap Diagnostics and Ai-Based Real-Time Optimization of Coal-Fired Power Plants

Accurate measurement of boiler efficiency, turbine heat rate (THR), gross heat rate (GHR) and heat rate deviations are fundamental to assessing the true performance of a coal-fired generating unit during Performance Guarantee (PG) test and routine O&M phase. Small errors in coal flow, coal calorific value, steam flow, enthalpy, generator output, flue-gas measurements and correction factors can produce significant errors in calculated heat rate. This paper presents a practical methodology based primarily on ASME Performance Test Codes (PTCs), with emphasis on PTC 4 for fuel fired steam generators, PTC 6 for steam turbines, PTC 46 for overall plant performance and PTC 19.1 for test uncertainty. This paper emphasizes direct and indirect measurement methods, OEM correction curves, heat-rate gap analysis, repeatability, uncertainty, test preparation, coal sampling, practical do's and don'ts and application of AI.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-14
DOI
https://doi.org/10.5281/zenodo.24213632
Primary Topic
Advanced Power Generation Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

A Practical Approach to Comprehensive Performance Evaluation, Heat Rate Gap Diagnostics and Ai-Based Real-Time Optimization of Coal-Fired Power Plants

Sunil Kumar Gupta, M Senthil
Zenodo (CERN European Organization for Nuclear Research)
Advanced Power Generation Technologies
article

A Practical Approach to Comprehensive Performance Evaluation, Heat Rate Gap Diagnostics and Ai-Based Real-Time Optimization of Coal-Fired Power Plants

Sunil Kumar Gupta, M Senthil
article en

Abstract

Accurate measurement of boiler efficiency, turbine heat rate (THR), gross heat rate (GHR) and heat rate deviations are fundamental to assessing the true performance of a coal-fired generating unit during Performance Guarantee (PG) test and routine O&M phase. Small errors in coal flow, coal calorific value, steam flow, enthalpy, generator output, flue-gas measurements and correction factors can produce significant errors in calculated heat rate. This paper presents a practical methodology based primarily on ASME Performance Test Codes (PTCs), with emphasis on PTC 4 for fuel fired steam generators, PTC 6 for steam turbines, PTC 46 for overall plant performance and PTC 19.1 for test uncertainty. This paper emphasizes direct and indirect measurement methods, OEM correction curves, heat-rate gap analysis, repeatability, uncertainty, test preparation, coal sampling, practical do's and don'ts and application of AI.

Zenodo (CERN European Organization for Nuclear Research)
Affordable and clean energy
Advanced Power Generation Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon