Prioritization of Machinery Replacement through Incremental Economic Analysis and FUCOM-TOPSIS in a Furniture Company in Hidalgo

The renewal of machinery in companies with limited financial resources requires distinguishing between the economic convenience of replacing an asset and the relative priority of the available projects. This study analyzes four proposed replacements for Mobilesco con Firmeza, a furniture company located in Hidalgo, Mexico: panel saw, industrial cutoff saw, electrostatic paint booth, and electrostatic paint oven. A quantitative, non-experimental, documentary case study was developed, based on the critical review of the provided file. The procedure reconstructed the defender–challenger cash flows, calculated present value, annual worth, and incremental internal rate of return, and used the weights attributed to FUCOM to perform a TOPSIS ranking. Inconsistencies of transcription, economic thresholds, and sensitivity scenarios were also examined. The corrected results ranked the panel saw in first place, with a closeness coefficient of 0.814232, followed by the cutoff saw, the oven, and the booth. However, the four projects presented negative incremental present values at the recorded evaluation rates. The panel saw would require additional net benefits of 8,072.21 pesos per year to reach financial equilibrium. Its first position was preserved in 21 of 22 individual weight perturbations, but passed to the cutoff saw when the relative weight of capacity was increased by 20%. The hypothesis of priority for the panel saw received conditional support; that of immediate economic viability was not supported. It is concluded that the model allows organizing the review of investments, although it does not by itself justify their execution. Its definitive application requires validating the technical valuations, homologating energy consumption, and documenting the original preferences of the evaluating team.

Authors

Institutions

Publication Details

Journal
International Journal of Research and Innovation in Social Science
Published
2026-11-14
DOI
https://doi.org/10.47772/ijriss.2026.102500003
Primary Topic
Multi-Criteria Decision Making
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Prioritization of Machinery Replacement through Incremental Economic Analysis and FUCOM-TOPSIS in a Furniture Company in Hidalgo

Yohensis Mariam Guillen Zamora, Erik Rodríguez Soto, Carlos Darío Acevedo Magaña, Dariana Anaya González et al.
International Journal of Research and Innovation in Social Science
Multi-Criteria Decision Making
article

Prioritization of Machinery Replacement through Incremental Economic Analysis and FUCOM-TOPSIS in a Furniture Company in Hidalgo

Yohensis Mariam Guillen Zamora, Erik Rodríguez Soto, Carlos Darío Acevedo Magaña, Dariana Anaya González, Claudia Reyes Bolaños, Verónica Gómez Arriaga
article en

Abstract

The renewal of machinery in companies with limited financial resources requires distinguishing between the economic convenience of replacing an asset and the relative priority of the available projects. This study analyzes four proposed replacements for Mobilesco con Firmeza, a furniture company located in Hidalgo, Mexico: panel saw, industrial cutoff saw, electrostatic paint booth, and electrostatic paint oven. A quantitative, non-experimental, documentary case study was developed, based on the critical review of the provided file. The procedure reconstructed the defender–challenger cash flows, calculated present value, annual worth, and incremental internal rate of return, and used the weights attributed to FUCOM to perform a TOPSIS ranking. Inconsistencies of transcription, economic thresholds, and sensitivity scenarios were also examined. The corrected results ranked the panel saw in first place, with a closeness coefficient of 0.814232, followed by the cutoff saw, the oven, and the booth. However, the four projects presented negative incremental present values at the recorded evaluation rates. The panel saw would require additional net benefits of 8,072.21 pesos per year to reach financial equilibrium. Its first position was preserved in 21 of 22 individual weight perturbations, but passed to the cutoff saw when the relative weight of capacity was increased by 20%. The hypothesis of priority for the panel saw received conditional support; that of immediate economic viability was not supported. It is concluded that the model allows organizing the review of investments, although it does not by itself justify their execution. Its definitive application requires validating the technical valuations, homologating energy consumption, and documenting the original preferences of the evaluating team.

International Journal of Research and Innovation in Social ScienceVol. 10(25)
Tecnológico Nacional de México, Campus Pachuca (MX)
Multi-Criteria Decision Making
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon