ANALYSIS OF TIME WASTE IN READY-MIX PRODUCTION USING THE LEAN MANUFACTURING APPROACH WITH THE VALUE STREAM MAPPING (VSM) METHOD IN THE CONCRETE MANUFACTURING INDUSTRY
This study aims to identify waste and reduce time waste in the ready-mix concrete production process through proposed improvements at PT Bosowa Beton Indonesia by applying a quantitative descriptive approach, with data collected through observation, interviews, and documentation and analyzed using Process Activity Mapping (PAM), Current State Mapping (CSM), waste identification, 5W+1H analysis, and Future State Mapping (FSM), with the results showing that waiting was the dominant form of waste, while the initial condition had a lead time of 40.44 minutes consisting of 10.81 minutes of Value Added (VA), 12.42 minutes of Non-Value Added (NVA), and 17.21 minutes of Necessary Non-Value Added (NNVA), which was reduced to 30.65 minutes after implementing the proposed improvements, with NVA activities successfully eliminated, demonstrating that the application of Lean Manufacturing using the Value Stream Mapping method is effective in identifying waste, reducing production time, and improving the efficiency of the ready-mix concrete production process.
Authors
- Rahmaniah Malik
- Yan Herdianzah
- Alifah Dwi Putri
Publication Details
- Journal
- Journal of Industrial Engineering Management
- Published
- 2026-11-12
- Primary Topic
- Management and Optimization Techniques
- Type
- article
- Field-Weighted Citation Impact
- 0.00