From Presale Financing to Project FinanceDeveloper Incentives, Credit Access, and Bank Risk in Housing Development

Abstract Housing presales provide construction-period funding but also expose buyers and lenders to noncompletion risk. This paper develops a project-finance model in which restrictions on early buyer funding increase the development loan required before completion, while bank pricing and a developer’s unobservable completion effort are jointly determined. China’s August 2026 housing reforms motivate the institutional setting, but the model addresses the more general financing trade-off created when advance customer funding is replaced by monitored project debt. Three results follow. First, stronger supervision and better recovery do not necessarily raise equilibrium completion probability: a larger debt burden can reduce the developer’s retained payoff and weaken effort enough to offset the direct monitoring gain. Second, financing access depends on the joint consistency of loan pricing, effort, participation, and underwriting; under sufficient conditions this generates a project-equity threshold. Third, expected credit loss separates into risk-quality, exposure, and selection effects, so a safer continuing project can coexist with greater loan exposure or a changing set of financed projects. Numerical illustrations show the effort-feedback reversal and the equity-access boundary. The framework clarifies why financing access and bank risk should be evaluated separately when presale funding is restricted.

Authors

Institutions

Publication Details

Journal
Research Square
Published
2026-11-13
DOI
https://doi.org/10.21203/rs.3.rs-11504830/v1
Primary Topic
Housing Market and Economics
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

From Presale Financing to Project FinanceDeveloper Incentives, Credit Access, and Bank Risk in Housing Development

Gaige Zhang, Qimeng Wang, Wu Zhou
Research Square
Housing Market and Economics
preprint

From Presale Financing to Project FinanceDeveloper Incentives, Credit Access, and Bank Risk in Housing Development

Gaige Zhang, Qimeng Wang, Wu Zhou
preprint en

Abstract

Abstract Housing presales provide construction-period funding but also expose buyers and lenders to noncompletion risk. This paper develops a project-finance model in which restrictions on early buyer funding increase the development loan required before completion, while bank pricing and a developer’s unobservable completion effort are jointly determined. China’s August 2026 housing reforms motivate the institutional setting, but the model addresses the more general financing trade-off created when advance customer funding is replaced by monitored project debt. Three results follow. First, stronger supervision and better recovery do not necessarily raise equilibrium completion probability: a larger debt burden can reduce the developer’s retained payoff and weaken effort enough to offset the direct monitoring gain. Second, financing access depends on the joint consistency of loan pricing, effort, participation, and underwriting; under sufficient conditions this generates a project-equity threshold. Third, expected credit loss separates into risk-quality, exposure, and selection effects, so a safer continuing project can coexist with greater loan exposure or a changing set of financed projects. Numerical illustrations show the effort-feedback reversal and the equity-access boundary. The framework clarifies why financing access and bank risk should be evaluated separately when presale funding is restricted.

Research Square
China University of Petroleum, Beijing (CN)
Housing Market and Economics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon