CoSPACE: Coordinated Construction Scheduling, Material Logistics, Shared Storage, and Crew Deployment for Resource-Efficient Site Planning

Resource-efficient construction planning requires coordination of schedules, material replenishment, limited storage and crew deployment. This study develops CoSPACE, a four-layer chromosome and seven-stage engineering decoder that jointly evaluates project duration (PD), material logistics cost (MC) and crew idle exposure (CIE). CIE measures unused capacity within each labour type’s deployment window, avoiding the redundancy between whole-project idle labour and PD under fixed workloads. Thirty seeded search archives are reconstructed for a deterministic ten-activity benchmark, with decoded-plan verification, an earliest-start reference and controlled gene-group interventions. Nine empirical pooled non-dominated points attain the verified 33-day duration bound. MC ranges from 1473.48 to 1662.40 monetary units as CIE decreases from 119 to 67 worker-days. For this benchmark, a selected compromise reduces MC by 21.94% and CIE by 9.41% against the deterministic reference. Controlled replays distinguish inventory, ordering-frequency and mobilization mechanisms; fixing priorities leaves the compromise unchanged, whereas removing delays worsens logistics cost and CIE. A separate matched-budget study evaluates four fixed cases, including two constructed instances and an adapted published project network with hypothetical logistics and non-interchangeable labour. Receipt flexibility improves HV on two cases, and including CIE in selection improves HV on that adapted network after multiplicity correction; no NSGA-II advantage over SPEA2 is established. Storage-floor sensitivity confirms a restricted allocation domain, but no corrected HV difference under the tested budget. These comparisons do not establish field effectiveness. Environmental impacts and uncertain supply require further evidence.

Authors

Institutions

Publication Details

Journal
Sustainability
Published
2026-11-13
DOI
https://doi.org/10.3390/su182211593
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

CoSPACE: Coordinated Construction Scheduling, Material Logistics, Shared Storage, and Crew Deployment for Resource-Efficient Site Planning

Narongrit Wongwai, Suphawut Malaikrisanachalee, Wittaya Srisomboon, Phaisan Suphanat
Sustainability
Resource-Constrained Project Scheduling
article

CoSPACE: Coordinated Construction Scheduling, Material Logistics, Shared Storage, and Crew Deployment for Resource-Efficient Site Planning

Narongrit Wongwai, Suphawut Malaikrisanachalee, Wittaya Srisomboon, Phaisan Suphanat
article en

Abstract

Resource-efficient construction planning requires coordination of schedules, material replenishment, limited storage and crew deployment. This study develops CoSPACE, a four-layer chromosome and seven-stage engineering decoder that jointly evaluates project duration (PD), material logistics cost (MC) and crew idle exposure (CIE). CIE measures unused capacity within each labour type’s deployment window, avoiding the redundancy between whole-project idle labour and PD under fixed workloads. Thirty seeded search archives are reconstructed for a deterministic ten-activity benchmark, with decoded-plan verification, an earliest-start reference and controlled gene-group interventions. Nine empirical pooled non-dominated points attain the verified 33-day duration bound. MC ranges from 1473.48 to 1662.40 monetary units as CIE decreases from 119 to 67 worker-days. For this benchmark, a selected compromise reduces MC by 21.94% and CIE by 9.41% against the deterministic reference. Controlled replays distinguish inventory, ordering-frequency and mobilization mechanisms; fixing priorities leaves the compromise unchanged, whereas removing delays worsens logistics cost and CIE. A separate matched-budget study evaluates four fixed cases, including two constructed instances and an adapted published project network with hypothetical logistics and non-interchangeable labour. Receipt flexibility improves HV on two cases, and including CIE in selection improves HV on that adapted network after multiplicity correction; no NSGA-II advantage over SPEA2 is established. Storage-floor sensitivity confirms a restricted allocation domain, but no corrected HV difference under the tested budget. These comparisons do not establish field effectiveness. Environmental impacts and uncertain supply require further evidence.

SustainabilityVol. 18(22)
Kasetsart University (TH)
Responsible consumption and production, Industry, innovation and infrastructure
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon