Consequences of delays in repairing installations—an analysis of risks and environmental costs

Regular renovations of water supply, sewer, and central heating systems in residential buildings are essential to maintaining their functionality. Delaying such work leads to system failures which, due to the concealed and underfloor routing of the systems, cause damage to building partitions and necessitate the restoration of building components. This results in a broader scope of work and a greater volume of waste. Various renovation strategies were analysed in buildings constructed using traditional methods, assessing the impact of delayed renovation schedules on the technical condition of the structures and the scope of necessary work. The aim of the study was to develop a method for planning system renovations that minimises construction waste, utilising the PRPSF ageing model. The analysis covered three maintenance strategy models: optimal repair intervention, delaying maintenance, and complete abandonment of maintenance activities. Results of the analysis of models for different scopes of maintenance confirm the necessity of conducting renovations on schedule, as delays increase the amount of waste and the risk of degradation, requiring the identification of hazards, risk assessment, and monitoring of corrective actions.

Authors

Institutions

Publication Details

Journal
Economics and Environment
Published
2026-11-13
DOI
https://doi.org/10.34659/eis.2026.98.3.1519
Primary Topic
Life Cycle Costing Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Consequences of delays in repairing installations—an analysis of risks and environmental costs

Beata Nowogońska, Ireneusz Nowogoński
Economics and Environment
Life Cycle Costing Analysis
article

Consequences of delays in repairing installations—an analysis of risks and environmental costs

Beata Nowogońska, Ireneusz Nowogoński
article en

Abstract

Regular renovations of water supply, sewer, and central heating systems in residential buildings are essential to maintaining their functionality. Delaying such work leads to system failures which, due to the concealed and underfloor routing of the systems, cause damage to building partitions and necessitate the restoration of building components. This results in a broader scope of work and a greater volume of waste. Various renovation strategies were analysed in buildings constructed using traditional methods, assessing the impact of delayed renovation schedules on the technical condition of the structures and the scope of necessary work. The aim of the study was to develop a method for planning system renovations that minimises construction waste, utilising the PRPSF ageing model. The analysis covered three maintenance strategy models: optimal repair intervention, delaying maintenance, and complete abandonment of maintenance activities. Results of the analysis of models for different scopes of maintenance confirm the necessity of conducting renovations on schedule, as delays increase the amount of waste and the risk of degradation, requiring the identification of hazards, risk assessment, and monitoring of corrective actions.

Economics and EnvironmentVol. 98(3)
University of Zielona Góra (PL)
Sustainable cities and communities, Responsible consumption and production, Industry, innovation and infrastructure
Life Cycle Costing Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon