Design Blueprint: A Cryogenic Boiloff Reliquefier for Orbital Propellant Depots: Heat-Leak, Carnot and Refrigeration-Power Budgets

Design blueprint derived from the source paper (DOI 10.5281/zenodo.24184998): This paper presents a computed design study, SIMULATED, NOT MEASURED, for reliquefied propellant returned to the depot tanks, with zero routine venting in orbit, using boiloff vapour from liquid hydrogen and liquid oxygen depot tanks. The operating principle is distinct from neighbouring production methods: a closed-cycle helium refrigerator intercepts boiloff vapour from depot tanks and condenses it back to liquid, replacing the usual practice of venting or burning off the excess. The physics is refrigeration thermodynamics: a measured-style heat leak sets the boiloff, the Carnot limit sets the least possible work, and a realistic fraction of Carnot sets the electrical bill. Hydrogen and oxygen are treated separately because their temperatures, and therefore their costs, differ by a factor of several. Sizing follows from budgets computed in the accompanying script rather than from analogy with terrestrial equipment. The headline figures are a specific energy of 44.7 megajoules per kilogram of product, an installed electrical power of 3.81 kilowatts, a production rate of 0.307 kilograms per hour, and an annual throughput of 2.43e+03 kilograms over 330 operating days. Rejecting 2.09 kilowatts of waste heat at 340 kelvin requires 3.14 square metres of radiator, a photovoltaic supply requires 9.33 square metres of array, and the installed mass is 676 kilograms. Moving feedstock from a 400 kilometre to an 800 kilometre orbit costs 217 metres per second of velocity change. The study is a computed study with no targeting or weapon application; it concerns civilian production equipment only, and none of its figures is a measurement. Status: DESIGN BLUEPRINT — SIMULATED, NOT MEASURED — NOT BUILT. All numbers are simulated values from the source paper's computation, deposited with this blueprint as compute.py and results.json. AI-use disclosure: Dave, an AI research system, assisted with the computation and drafting under the author's direction; author of record William Alexander Aldred.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-13
DOI
https://doi.org/10.5281/zenodo.24185675
Primary Topic
Spacecraft and Cryogenic Technologies
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

Design Blueprint: A Cryogenic Boiloff Reliquefier for Orbital Propellant Depots: Heat-Leak, Carnot and Refrigeration-Power Budgets

William Alexander Aldred
2 links
Zenodo (CERN European Organization for Nuclear Research)
Spacecraft and Cryogenic Technologies
preprint

Design Blueprint: A Cryogenic Boiloff Reliquefier for Orbital Propellant Depots: Heat-Leak, Carnot and Refrigeration-Power Budgets

William Alexander Aldred
preprint en

Abstract

Design blueprint derived from the source paper (DOI 10.5281/zenodo.24184998): This paper presents a computed design study, SIMULATED, NOT MEASURED, for reliquefied propellant returned to the depot tanks, with zero routine venting in orbit, using boiloff vapour from liquid hydrogen and liquid oxygen depot tanks. The operating principle is distinct from neighbouring production methods: a closed-cycle helium refrigerator intercepts boiloff vapour from depot tanks and condenses it back to liquid, replacing the usual practice of venting or burning off the excess. The physics is refrigeration thermodynamics: a measured-style heat leak sets the boiloff, the Carnot limit sets the least possible work, and a realistic fraction of Carnot sets the electrical bill. Hydrogen and oxygen are treated separately because their temperatures, and therefore their costs, differ by a factor of several. Sizing follows from budgets computed in the accompanying script rather than from analogy with terrestrial equipment. The headline figures are a specific energy of 44.7 megajoules per kilogram of product, an installed electrical power of 3.81 kilowatts, a production rate of 0.307 kilograms per hour, and an annual throughput of 2.43e+03 kilograms over 330 operating days. Rejecting 2.09 kilowatts of waste heat at 340 kelvin requires 3.14 square metres of radiator, a photovoltaic supply requires 9.33 square metres of array, and the installed mass is 676 kilograms. Moving feedstock from a 400 kilometre to an 800 kilometre orbit costs 217 metres per second of velocity change. The study is a computed study with no targeting or weapon application; it concerns civilian production equipment only, and none of its figures is a measurement. Status: DESIGN BLUEPRINT — SIMULATED, NOT MEASURED — NOT BUILT. All numbers are simulated values from the source paper's computation, deposited with this blueprint as compute.py and results.json. AI-use disclosure: Dave, an AI research system, assisted with the computation and drafting under the author's direction; author of record William Alexander Aldred.

Zenodo (CERN European Organization for Nuclear Research)
Affordable and clean energy, Responsible consumption and production
Spacecraft and Cryogenic Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon