Cascades from Absorbed TeV Light: How Much of the GeV Background Is Reprocessed Blazar Emission?

Some of the gamma rays absorbed on the extragalactic background light do not disappear: the pairs they produce re-radiate at lower energies, returning part of the absorbed power to the GeV background as cascade emission. This paper estimates that returned fraction from the blazar TeV energy budget, a stated absorbed fraction and a stated cascade efficiency, and sets it beside a magnetic-field time-delay scale for the cascade. It finds cascade fraction of GeV background approx = 0.0814; delay at 1e-16G yr = 1.000e+04. The cascade is a percent-to-tens-of-percent correction to the blazar budget, large enough to matter for precision accounting and small enough not to disturb the overall composition. The study is simulated and computed, not measured.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-13
DOI
https://doi.org/10.5281/zenodo.24182850
Primary Topic
Astrophysics and Cosmic Phenomena
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Cascades from Absorbed TeV Light: How Much of the GeV Background Is Reprocessed Blazar Emission?

William Alexander Aldred
Zenodo (CERN European Organization for Nuclear Research)
Astrophysics and Cosmic Phenomena
article

Cascades from Absorbed TeV Light: How Much of the GeV Background Is Reprocessed Blazar Emission?

William Alexander Aldred
article en

Abstract

Some of the gamma rays absorbed on the extragalactic background light do not disappear: the pairs they produce re-radiate at lower energies, returning part of the absorbed power to the GeV background as cascade emission. This paper estimates that returned fraction from the blazar TeV energy budget, a stated absorbed fraction and a stated cascade efficiency, and sets it beside a magnetic-field time-delay scale for the cascade. It finds cascade fraction of GeV background approx = 0.0814; delay at 1e-16G yr = 1.000e+04. The cascade is a percent-to-tens-of-percent correction to the blazar budget, large enough to matter for precision accounting and small enough not to disturb the overall composition. The study is simulated and computed, not measured.

Zenodo (CERN European Organization for Nuclear Research)
Astrophysics and Cosmic Phenomena
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon