How Well Must a Time Delay Be Measured? Inverting the Budget for Monitoring Campaigns

Given a per-lens Fermat and modelling floor of 2.5 per cent, the delay precision a monitoring campaign must deliver for total per-lens budgets of four, five and seven per cent is computed. A four per cent total allows a delay fraction of 0.0312, which is 0.62 days on a twenty-day delay and 3.12 days on a hundred-day delay; a seven per cent total relaxes the allowance to 0.0654. For the shortest-delay benchmark system, even a one-day delay error pushes the per-lens total to 7.57 per cent. Sub-day delay precision is therefore a hard requirement for short-delay systems in any precision programme, and cadence and season length should be designed against the tabulated allowances rather than against convention. Computed; not measured.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-13
DOI
https://doi.org/10.5281/zenodo.24182957
Primary Topic
Stellar, planetary, and galactic studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

How Well Must a Time Delay Be Measured? Inverting the Budget for Monitoring Campaigns

William Alexander Aldred
Zenodo (CERN European Organization for Nuclear Research)
Stellar, planetary, and galactic studies
article

How Well Must a Time Delay Be Measured? Inverting the Budget for Monitoring Campaigns

William Alexander Aldred
article en

Abstract

Given a per-lens Fermat and modelling floor of 2.5 per cent, the delay precision a monitoring campaign must deliver for total per-lens budgets of four, five and seven per cent is computed. A four per cent total allows a delay fraction of 0.0312, which is 0.62 days on a twenty-day delay and 3.12 days on a hundred-day delay; a seven per cent total relaxes the allowance to 0.0654. For the shortest-delay benchmark system, even a one-day delay error pushes the per-lens total to 7.57 per cent. Sub-day delay precision is therefore a hard requirement for short-delay systems in any precision programme, and cadence and season length should be designed against the tabulated allowances rather than against convention. Computed; not measured.

Zenodo (CERN European Organization for Nuclear Research)
Stellar, planetary, and galactic studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon