Power-Circle Vulnerability Assessment and Two-Stage IPSO-Based Multi-STATCOM Allocation for Fine Voltage Regulation in Distribution Networks

A two-stage improved particle swarm optimization (IPSO) framework is proposed for multi-STATCOM siting and sizing in radial distribution networks, together with a power-circle external-tangency margin for independent electrical-vulnerability assessment. The power-circle margin is formulated from branch active- and reactive-power circle relationships, aggregated by the arithmetic mean of incident-branch margins to avoid topological-degree bias, and cross-checked against Q–V continuation-power-flow results and load-level sensitivity. STATCOM planning minimizes the annual cost of active-power losses, annualized device investment, and operation and maintenance under hard voltage constraints. In the first optimization stage, two installation locations and coarse capacities are searched jointly; the second stage fixes the selected locations and continuously refines the capacities. On the IEEE 33-bus system, the power-circle and Q–V rankings show a Spearman correlation of 0.8644 and 90% Top-10 overlap. Deterministic enumeration identifies Bus 7 with 3.6689 Mvar as the best single-STATCOM solution, whereas the optimal dual configuration is 0.5583 Mvar at Bus 16 and 1.1571 Mvar at Bus 30. The dual solution reduces annual cost by 38.86% relative to the optimal single-device solution and reduces active-power loss to 0.1402 MW while satisfying all normal-operation voltage limits. Across 30 independent runs on the dual-device problem, the proposed IPSO attains the highest location-pair and global-solution success rates (33.33%) and the lowest mean objective value among six compared algorithms. Under restored N − 1 contingencies, the normal-operation economic optimum improves post-contingency voltage performance but is capacity-limited; with the locations fixed, a total rating of 6.5693 Mvar is required to satisfy all 31 restorable contingencies, revealing the trade-off between normal-operation economy and post-contingency voltage compliance.

Authors

Institutions

Publication Details

Journal
Processes
Published
2026-11-13
DOI
https://doi.org/10.3390/pr14223669
Primary Topic
Optimal Power Flow Distribution
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Power-Circle Vulnerability Assessment and Two-Stage IPSO-Based Multi-STATCOM Allocation for Fine Voltage Regulation in Distribution Networks

Yuanyuan Wang, Jie Zhang, Yujie Du, Qiuyang Li et al.
Processes
Optimal Power Flow Distribution
article

Power-Circle Vulnerability Assessment and Two-Stage IPSO-Based Multi-STATCOM Allocation for Fine Voltage Regulation in Distribution Networks

Yuanyuan Wang, Jie Zhang, Yujie Du, Qiuyang Li, Yulong Qiao, Junjie Xia, Zhibin Hu, Xuan Wang, Yonfei Ma
article en

Abstract

A two-stage improved particle swarm optimization (IPSO) framework is proposed for multi-STATCOM siting and sizing in radial distribution networks, together with a power-circle external-tangency margin for independent electrical-vulnerability assessment. The power-circle margin is formulated from branch active- and reactive-power circle relationships, aggregated by the arithmetic mean of incident-branch margins to avoid topological-degree bias, and cross-checked against Q–V continuation-power-flow results and load-level sensitivity. STATCOM planning minimizes the annual cost of active-power losses, annualized device investment, and operation and maintenance under hard voltage constraints. In the first optimization stage, two installation locations and coarse capacities are searched jointly; the second stage fixes the selected locations and continuously refines the capacities. On the IEEE 33-bus system, the power-circle and Q–V rankings show a Spearman correlation of 0.8644 and 90% Top-10 overlap. Deterministic enumeration identifies Bus 7 with 3.6689 Mvar as the best single-STATCOM solution, whereas the optimal dual configuration is 0.5583 Mvar at Bus 16 and 1.1571 Mvar at Bus 30. The dual solution reduces annual cost by 38.86% relative to the optimal single-device solution and reduces active-power loss to 0.1402 MW while satisfying all normal-operation voltage limits. Across 30 independent runs on the dual-device problem, the proposed IPSO attains the highest location-pair and global-solution success rates (33.33%) and the lowest mean objective value among six compared algorithms. Under restored N − 1 contingencies, the normal-operation economic optimum improves post-contingency voltage performance but is capacity-limited; with the locations fixed, a total rating of 6.5693 Mvar is required to satisfy all 31 restorable contingencies, revealing the trade-off between normal-operation economy and post-contingency voltage compliance.

ProcessesVol. 14(22)
Electric Power Research Institute (US), State Grid Corporation of China (China) (CN), Changsha University of Science and Technology (CN)
National Natural Science Foundation of China
Industry, innovation and infrastructure, Affordable and clean energy
Optimal Power Flow Distribution
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon