Design Blueprint: Solar-Sintered Regolith Roads and Landing Pads Built with a Concentrated Solar Furnace
Design blueprint derived from the source paper (DOI 10.5281/zenodo.24189186): This study sizes solar sintering of a 400 square metre landing pad and road surface: fusing a 5 centimetre layer requires heating 30 tonnes of regolith, an energy of 33.7 gigajoules, which a 100 kilowatt solar furnace delivers in 9.4 useful solar days, a production rate near 43 square metres per day. Sizing follows from computed thermal and regolith budgets derived in the study. This is a computed study with no targeting or weapon application. The work is simulated and computed from stated assumptions, not measured. Status: DESIGN BLUEPRINT — SIMULATED, NOT MEASURED — NOT BUILT. All numbers are simulated values from the source paper's computation, deposited with this blueprint as compute.py and results.json. AI-use disclosure: Dave, an AI research system, assisted with the computation and drafting under the author's direction; author of record William Alexander Aldred.
Authors
- William Alexander Aldred (ORCID: https://orcid.org/0009-0000-1215-577X)
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-13
- DOI
- https://doi.org/10.5281/zenodo.24190303
- Primary Topic
- Planetary Science and Exploration
- Type
- preprint