A Phobos-Anchored Tether for Mars Access: Downward Span, Release Velocity and Capture Budgets

This study sizes the system named in its title from stated physical relations and a stated operating basis, and reports the result as SIMULATED, NOT MEASURED. The operating principle is tether anchored on Phobos extending toward Mars, exploiting the moon's orbital motion. The Phobos tether is a civilian transport system intended to lower cargo toward Mars and receive arriving freight vehicles; it carries no payload other than transport cargo and entry capsules supplied by its users. Every performance figure is computed by the deposited script from its inputs rather than asserted, and the headline outcomes include orbital velocity of Phobos of 2135.7 metres per second; velocity of the lower tether tip in the Mars-centred frame of 1180.4 metres per second; payload velocity at the atmospheric entry interface after release of 3043 metres per second; peak entry heating relative to a direct arrival at the stated reference speed of 0.13. Mass, power, time and energy budgets are assembled from components so they can be audited line by line, off-design behaviour is discussed openly, and the limits of the sizing are stated in full. The design is presented as a civilian system throughout, with its governing constraint identified and quantified rather than merely encountered.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-14
DOI
https://doi.org/10.5281/zenodo.24209448
Primary Topic
Space Satellite Systems and Control
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

A Phobos-Anchored Tether for Mars Access: Downward Span, Release Velocity and Capture Budgets

William Alexander Aldred
2 links
Zenodo (CERN European Organization for Nuclear Research)
Space Satellite Systems and Control
article

A Phobos-Anchored Tether for Mars Access: Downward Span, Release Velocity and Capture Budgets

William Alexander Aldred
article en

Abstract

This study sizes the system named in its title from stated physical relations and a stated operating basis, and reports the result as SIMULATED, NOT MEASURED. The operating principle is tether anchored on Phobos extending toward Mars, exploiting the moon's orbital motion. The Phobos tether is a civilian transport system intended to lower cargo toward Mars and receive arriving freight vehicles; it carries no payload other than transport cargo and entry capsules supplied by its users. Every performance figure is computed by the deposited script from its inputs rather than asserted, and the headline outcomes include orbital velocity of Phobos of 2135.7 metres per second; velocity of the lower tether tip in the Mars-centred frame of 1180.4 metres per second; payload velocity at the atmospheric entry interface after release of 3043 metres per second; peak entry heating relative to a direct arrival at the stated reference speed of 0.13. Mass, power, time and energy budgets are assembled from components so they can be audited line by line, off-design behaviour is discussed openly, and the limits of the sizing are stated in full. The design is presented as a civilian system throughout, with its governing constraint identified and quantified rather than merely encountered.

Zenodo (CERN European Organization for Nuclear Research)
Space Satellite Systems and Control
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon