Design Blueprint: An Inchworm Robotic Assembler for Orbital Construction of a 100-Metre Truss: Joint Energy, Traverse and Schedule Budgets

Design blueprint derived from the source paper (DOI 10.5281/zenodo.24185059): This paper presents a computed design study, SIMULATED, NOT MEASURED, for a 100 metre backbone truss for antennas, radiators and solar arrays in orbit, using pre-manufactured carbon-composite struts and node fittings launched as a kit. The operating principle is distinct from neighbouring production methods: a two-ended inchworm robot walks along the truss it is building, alternately gripping with each end, placing struts from a carried magazine and driving each joint home, so the structure itself is the robot's railway and no free-flying translation is needed for most operations. Assembly consumes joint-driving and locomotion energy rather than process heat, and the schedule is set by cycle time per bay multiplied across the structure. Sizing follows from budgets computed in the accompanying script rather than from analogy with terrestrial equipment. The headline figures are a specific energy of 0.0373 megajoules per kilogram of product, an installed electrical power of 0.85 kilowatts, a production rate of 82.1 kilograms per hour, and an annual throughput of 6.5e+05 kilograms over 330 operating days. Rejecting 0.468 kilowatts of waste heat at 310 kelvin requires 1.01 square metres of radiator, a photovoltaic supply requires 2.08 square metres of array, and the installed mass is 268 kilograms. Moving feedstock from a 400 kilometre to an 800 kilometre orbit costs 217 metres per second of velocity change. The study is a computed study with no targeting or weapon application; it concerns civilian production equipment only, and none of its figures is a measurement. Status: DESIGN BLUEPRINT — SIMULATED, NOT MEASURED — NOT BUILT. All numbers are simulated values from the source paper's computation, deposited with this blueprint as compute.py and results.json. AI-use disclosure: Dave, an AI research system, assisted with the computation and drafting under the author's direction; author of record William Alexander Aldred.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-13
DOI
https://doi.org/10.5281/zenodo.24185715
Primary Topic
Space Satellite Systems and Control
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

Design Blueprint: An Inchworm Robotic Assembler for Orbital Construction of a 100-Metre Truss: Joint Energy, Traverse and Schedule Budgets

William Alexander Aldred
2 links
Zenodo (CERN European Organization for Nuclear Research)
Space Satellite Systems and Control
preprint

Design Blueprint: An Inchworm Robotic Assembler for Orbital Construction of a 100-Metre Truss: Joint Energy, Traverse and Schedule Budgets

William Alexander Aldred
preprint en

Abstract

Design blueprint derived from the source paper (DOI 10.5281/zenodo.24185059): This paper presents a computed design study, SIMULATED, NOT MEASURED, for a 100 metre backbone truss for antennas, radiators and solar arrays in orbit, using pre-manufactured carbon-composite struts and node fittings launched as a kit. The operating principle is distinct from neighbouring production methods: a two-ended inchworm robot walks along the truss it is building, alternately gripping with each end, placing struts from a carried magazine and driving each joint home, so the structure itself is the robot's railway and no free-flying translation is needed for most operations. Assembly consumes joint-driving and locomotion energy rather than process heat, and the schedule is set by cycle time per bay multiplied across the structure. Sizing follows from budgets computed in the accompanying script rather than from analogy with terrestrial equipment. The headline figures are a specific energy of 0.0373 megajoules per kilogram of product, an installed electrical power of 0.85 kilowatts, a production rate of 82.1 kilograms per hour, and an annual throughput of 6.5e+05 kilograms over 330 operating days. Rejecting 0.468 kilowatts of waste heat at 310 kelvin requires 1.01 square metres of radiator, a photovoltaic supply requires 2.08 square metres of array, and the installed mass is 268 kilograms. Moving feedstock from a 400 kilometre to an 800 kilometre orbit costs 217 metres per second of velocity change. The study is a computed study with no targeting or weapon application; it concerns civilian production equipment only, and none of its figures is a measurement. Status: DESIGN BLUEPRINT — SIMULATED, NOT MEASURED — NOT BUILT. All numbers are simulated values from the source paper's computation, deposited with this blueprint as compute.py and results.json. AI-use disclosure: Dave, an AI research system, assisted with the computation and drafting under the author's direction; author of record William Alexander Aldred.

Zenodo (CERN European Organization for Nuclear Research)
Industry, innovation and infrastructure, Responsible consumption and production
Space Satellite Systems and Control
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon