Air Quality Monitoring and Testing During CIPP Installation for Water Mains
Key Takeaways Trenchless cured‐in‐place pipe (CIPP) offers a less disruptive, cost‐effective alternative to open‐cut water main replacement. DC Water implemented a rigorous air quality monitoring and testing plan to address regulatory and community concerns. Monitoring during nonstyrene epoxy CIPP installation confirmed that volatile organic compound concentrations remained below health‐based exposure limits. Air monitoring and emission testing can strengthen regulatory confidence and inform industry best practices.
Authors
- Burak Kaynak
- William Elledge
Publication Details
- Journal
- American Water Works Association
- Published
- 2026-11-12
- DOI
- https://doi.org/10.1002/awwa.70174
- Primary Topic
- Indoor Air Quality and Microbial Exposure
- Type
- article
- Field-Weighted Citation Impact
- 0.00