Error Budget for Chronometric Levelling Across a 1000 Kilometre Fibre Clock Network

A continental fibre network does not fail because its clocks are insufficient; it fails, if it does, in the accumulation of small link terms and in correlated environmental terms that do not average down with segment count. This study builds a segment-by-segment budget for a thousand-kilometre chain. The design question is concrete: with ten repeater segments, two endpoint clocks and a stated tide-model term, what height uncertainty survives, and which term should money be spent reducing first? The computed results, taken from the deposited script, are as follows in summary: The computed segments is 10. The computed link_per_seg is 2e-19. The computed clock_each is 1e-18. The computed rss_frac is 1.55e-18. The computed tide_frac is 5.46e-19. The computed total_frac is 1.64e-18. The computed total_height_cm is 1.51. The computed clock_only_cm is 1.3. The study is a computation from stated assumptions, not a measurement, and its figures should be read at the precision those assumptions support. SIMULATED, NOT MEASURED.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-12
DOI
https://doi.org/10.5281/zenodo.24155004
Citations
1
Primary Topic
Advanced Frequency and Time Standards
Type
article
Field-Weighted Citation Impact
1.20
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Error Budget for Chronometric Levelling Across a 1000 Kilometre Fibre Clock Network

William Alexander Aldred
1 citations
Zenodo (CERN European Organization for Nuclear Research)
Advanced Frequency and Time Standards
1.20
article

Error Budget for Chronometric Levelling Across a 1000 Kilometre Fibre Clock Network

William Alexander Aldred
article en
1 citations

Abstract

A continental fibre network does not fail because its clocks are insufficient; it fails, if it does, in the accumulation of small link terms and in correlated environmental terms that do not average down with segment count. This study builds a segment-by-segment budget for a thousand-kilometre chain. The design question is concrete: with ten repeater segments, two endpoint clocks and a stated tide-model term, what height uncertainty survives, and which term should money be spent reducing first? The computed results, taken from the deposited script, are as follows in summary: The computed segments is 10. The computed link_per_seg is 2e-19. The computed clock_each is 1e-18. The computed rss_frac is 1.55e-18. The computed tide_frac is 5.46e-19. The computed total_frac is 1.64e-18. The computed total_height_cm is 1.51. The computed clock_only_cm is 1.3. The study is a computation from stated assumptions, not a measurement, and its figures should be read at the precision those assumptions support. SIMULATED, NOT MEASURED.

Zenodo (CERN European Organization for Nuclear Research)
Openalex Percentile: Top 29%
Advanced Frequency and Time Standards
1.20
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon