COMPREHENSIVE INNOVATIVE TECHNICAL AND TECHNOLOGICAL SOLUTIONS FOR WELL CONSTRUCTION IN COMPLEX GEOLOGICAL AND TECHNOLOGICAL CONDITIONS

The article substantiates an integrated approach to improving well construction and casing technologies under complex geological and operational conditions by coordinating wellbore formation, rock destruction and bottomhole cleaning, casing, and cementing, as well as by applying technical solutions for intensified rock destruction and controlled cement slur-ry placement.The study is based on an analysis of the geological and technological conditions of the Kachanivske oil and gas condensate field, wellbore formation, and the sequence of drilling and cementing operations. Laboratory and theoretical studies established patterns of interaction between the working fluid and structural elements of drilling tools and cementing equipment. Theoretical analysis was used to evaluate mechanical rock destruction, pulsed hydraulic action, and controlled cement slurry placement.The relationship between individual stages of well construction was established, confirming the feasibility of considering them as a unified technological process. The combination of mechanical rock destruction with pulsed hydraulic action was analyzed to improve bottomhole cleaning efficiency. The cementing sequence was systematized, and its improvement through controlled cement slurry delivery via sequentially arranged cementing chambers was demonstrated. A calculation procedure for evaluating the main parameters of controlled cementing was proposed.An interconnected sequence of technical and technological solutions integrating well-bore formation, intensified rock destruction and bottomhole cleaning, casing, and controlled formation of the cement sheath was substantiated. The approach to evaluating hydraulic bit action and cement slurry delivery was improved by considering the relevant design and structural features of the respective equipment.The proposed approach can be used to substantiate technological parameters for well construction and casing under complex geological and operational conditions. The derived calculation relationships provide a basis for selecting rational operating parameters for drilling tools and controlled cementing.

Authors

Institutions

Publication Details

Journal
Integrated Technologies and Energy Saving
Published
2026-11-12
DOI
https://doi.org/10.20998/2078-5364.2026.3.10
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

COMPREHENSIVE INNOVATIVE TECHNICAL AND TECHNOLOGICAL SOLUTIONS FOR WELL CONSTRUCTION IN COMPLEX GEOLOGICAL AND TECHNOLOGICAL CONDITIONS

Ye.M. Stavychnyi, Islam Askerov, Andrii Ihnatov, Andrii Shumov
Integrated Technologies and Energy Saving
Drilling and Well Engineering
article

COMPREHENSIVE INNOVATIVE TECHNICAL AND TECHNOLOGICAL SOLUTIONS FOR WELL CONSTRUCTION IN COMPLEX GEOLOGICAL AND TECHNOLOGICAL CONDITIONS

Ye.M. Stavychnyi, Islam Askerov, Andrii Ihnatov, Andrii Shumov
article en

Abstract

The article substantiates an integrated approach to improving well construction and casing technologies under complex geological and operational conditions by coordinating wellbore formation, rock destruction and bottomhole cleaning, casing, and cementing, as well as by applying technical solutions for intensified rock destruction and controlled cement slur-ry placement.The study is based on an analysis of the geological and technological conditions of the Kachanivske oil and gas condensate field, wellbore formation, and the sequence of drilling and cementing operations. Laboratory and theoretical studies established patterns of interaction between the working fluid and structural elements of drilling tools and cementing equipment. Theoretical analysis was used to evaluate mechanical rock destruction, pulsed hydraulic action, and controlled cement slurry placement.The relationship between individual stages of well construction was established, confirming the feasibility of considering them as a unified technological process. The combination of mechanical rock destruction with pulsed hydraulic action was analyzed to improve bottomhole cleaning efficiency. The cementing sequence was systematized, and its improvement through controlled cement slurry delivery via sequentially arranged cementing chambers was demonstrated. A calculation procedure for evaluating the main parameters of controlled cementing was proposed.An interconnected sequence of technical and technological solutions integrating well-bore formation, intensified rock destruction and bottomhole cleaning, casing, and controlled formation of the cement sheath was substantiated. The approach to evaluating hydraulic bit action and cement slurry delivery was improved by considering the relevant design and structural features of the respective equipment.The proposed approach can be used to substantiate technological parameters for well construction and casing under complex geological and operational conditions. The derived calculation relationships provide a basis for selecting rational operating parameters for drilling tools and controlled cementing.

Integrated Technologies and Energy Saving(3)
Dnipro University of Technology (UA)
Industry, innovation and infrastructure
Drilling and Well Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon