HCTGS v49 Korea — Three Coasts, One Island Grid
Abstract HCTGS — Hydro-Core Tower Gravity Systems — is an open series of concept papers on one machine: a vertical tower or rock shaft that takes in seawater, separates it by heat into fresh water and dry minerals, and makes electricity on the way. Edition v49 applies the machine to the coasts of Korea with electricity as the first product and water as the second. All values follow the series template n5.48 and are calculated with steam tables; they are design values in ranges, and every assumption is named. One tower, minimum and maximum. At the reference output of 1 million m³ of distillate a day, the minimum case is a coastal tower in water mode on bought heat: 2.1–2.3 GW at 130–170 °C, a gain output ratio of about 12, a specific heat demand of 51–54 kWh_th per m³, 130–250 MW net electricity (1.1–2.2 TWh a year) and an investment of about €1.8 billion. The maximum case is a shaft beside an industrial cluster in power mode: 6.7–10.9 GW of named process heat give 0.68–1.02 GW net, 6.0–8.9 TWh a year, with 0.65–0.87 GW of bought heat at a gain output ratio of 30–40 and an investment of €0.8–1.5 billion. A low-temperature mode runs on 1.9–4.6 GW at 65–95 °C. In both cases the thermal mineral cascade yields, per tower and year at a salinity of 35 g/kg, 0.47–0.55 Mt of magnesia (469 kt of magnesium as capacity), about 10 Mt of sodium chloride, 278 kt of potassium chloride and 24.6 kt of bromine. Results range from a net water cost of €0.13–0.83 per m³ in the minimum case to an annual surplus of €259–685 million in the maximum case. The tower multiplies the use of the heat it receives, and its own magnesium and alloys add the top heat at 1,500–2,200 °C; the fleet is therefore sized by named heat: ten cluster towers give 3.65 billion m³ of water and 60–89 TWh a year (start); 74 towers deliver 27 billion m³ and 130–230 TWh (floor); 148 towers deliver 54 billion m³, twice the present use for a climate 3 °C warmer, and 210–390 TWh, which requires about 290–320 GW of named heat beyond the clusters (roof). Magnesium loop in two ledgers. In the energy ledger the loop is a store: 10–13 MWh of electrolysis power per tonne of metal return about 6.9 MWh of heat at 1,500–2,200 °C. In the money ledger it is a product route: the cascade delivers the magnesium chloride hot and close to crystallisation, so the cell electricity serves the split itself, and each hour the tower takes the cheapest available power or heat — its own turbines, reactor steam, industrial heat, surplus power or gas — and sells whatever earns more on the grid; at the series value of USD 20 per MWh the power costs USD 200–260 per tonne, and the 1.66 t of magnesia from burning sell for USD 1,000–1,330, with the top heat in addition. A price ladder follows the metal from about USD 2,500–3,000 per tonne today through aluminium parity at about USD 2,000 to its magnesia value at USD 1,000–1,330, opening a larger market at each step. Condensation by pressure. The condensation temperature is set by the pressure of each layer: 0.04 bar condenses at 29 °C, 0.08 bar at 41.5 °C, 0.35 bar at 72.7 °C and 0.7 bar at 90 °C. Cold is used where it is found and stays there (10–30 kWh per m³ against 1.7 kWh per m³ to pump water 500 m). Four new contributions (open prior art). NC-KR-1, rain condenser with barometric leg. A counterflow condenser rains distillate through the steam, with the coldest mist last and an inert-gas vent at the top. The condensate drains through a barometric leg of about 50 m (a 10 m column is enough to drain against vacuum) and holds the crown under vacuum without a pump. Several downpipes carry two circuits: a hot circuit at 0.35–0.7 bar (73–90 °C) takes about 4 % of the steam (1–2 % with multi-effect crystallisers) and delivers warm distillate to the crystallisers through a closed U-loop that costs only friction; a cool circuit at 0.04–0.08 bar gives the turbines their largest pressure drop. NC-KR-2, deep cold water as cold pole. Water below 1 °C under about 300 m allows condensation near 0.04 bar, about 16 % more electricity than at 0.08 bar. NC-KR-3, LNG regasification cold. About 46 Mt of LNG a year at about 0.8 GJ per tonne release roughly 1.2 GW of cold, used as a ladder: air separation and a cryogenic Rankine turbine from −162 to −100 °C, a closed propane or CO₂ loop charging a eutectic salt store from −100 to −21 °C, and chilled water for condenser peaks and AI halls from −21 to +15 °C. NC-KR-4, snow and ice storage on the heights. Surplus winter distillate is lifted at 1.7 kWh per m³ per 500 m and sprayed with gravity pressure on cold nights (ice-stupa principle); spring meltwater returns through pressure-break turbines that recover about 48 of every 71 units of lifting energy. Two-stage thermal storage (NC-MX-1 applied). A chloride melt (NaCl–MgCl₂–KCl eutectic) working between 550 and 450 °C sits above a crushed-rock bed working from 450 °C to ambient, coupled by a gas loop with no shared wall. Electricity charges the melt by resistance heating; steam at about 280 °C and process heat at about 200 °C charge the rock bed directly. Twelve hours of one tower's water-mode heat, about 26 GWh, need 0.5–0.75 Mt of rock; one TWh needs about 10 Mt of rock against about 14 Mt of melt over its full band of 400–650 °C. The edition closes with a supply-chain and consortium model governed by formula-priced contracts, a three-question pilot and a technology-readiness table for every component. The pilot replaces design values with measurements. All figures are design estimates for independent engineering validation and pilot measurement. Published as open prior art under CC BY-NC-ND 4.0.
Authors
- Ilir Mehmetaj
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-12
- DOI
- https://doi.org/10.5281/zenodo.24149163
- Primary Topic
- Thermodynamic and Exergetic Analyses of Power and Cooling Systems
- Type
- preprint