Gestão e controle de acuracidade de estoque de um estaleiro em Manaus.

The shipbuilding industry operates on a build-to-order basis, demanding high accuracy in the management and handling of its inventories. This study aimed to map and optimize the flow of material requisitions, production orders, transfers, returns, and material regularization in a large-scale shipyard in Manaus, Amazonas (Brazil). The central problem stems from discrepancies in the specification of material requisitions and production orders, which result in the improper allocation of these materials in the company's manufacturing yard. Exposed to Amazonian rains and weather, these materials suffer severe corrosion and become unusable when returned to the warehouse. Furthermore, the company's 60-day limit for returns induces ad-hoc system reincorporation through the artifice of "other entries," generating ghost inventories and breaking accounting traceability. Qualitative and exploratory research based on a case study was adopted, featuring direct on-site observation, semi-structured interviews with employees from the warehouse and PPCC (Production Planning and Control) departments, and process modeling using quality tools. To identify root causes, the Ishikawa Diagram and the 5 Whys technique were applied, highlighting the absence of technical quarantine, the lack of protocols for leftovers resulting from engineering changes, and the shortage of standardized inspection procedures. As an intervention proposal, the future-state modeling (TO-BE) was developed, structured in a 5W2H action plan and the drafting of a Standard Operating Procedure (SOP), establishing the reduction of the return window to up to 72 hours, the blocking of ad-hoc "other entries" adjustments in the ERP, and the mandatory segregation of returns pending Quality approval. Finally, a performance indicator (KPI) dashboard was formulated aimed at guaranteeing accuracy above 95%, ensuring the financial traceability of construction costs and the preservation of manufacturing assets.

Authors

Institutions

Publication Details

Journal
Revista fisio&terapia.
Published
2026-11-12
DOI
https://doi.org/10.69849/vk1v0933
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Gestão e controle de acuracidade de estoque de um estaleiro em Manaus.

Luciana Oliveira do Valle Carminé, Maria Clara de Oliveira Alves, Maria Eduarda da Silva Chaves, Emanuelle Oliveira de Souza et al.
Revista fisio&terapia.
Management and Optimization Techniques
article

Gestão e controle de acuracidade de estoque de um estaleiro em Manaus.

Luciana Oliveira do Valle Carminé, Maria Clara de Oliveira Alves, Maria Eduarda da Silva Chaves, Emanuelle Oliveira de Souza, Jessyca Katheleen Oliveira Carvalho, Felipe Matheus Figueiredo Tiburcio, Amanda Caroline Mesquita Vieira
article en

Abstract

The shipbuilding industry operates on a build-to-order basis, demanding high accuracy in the management and handling of its inventories. This study aimed to map and optimize the flow of material requisitions, production orders, transfers, returns, and material regularization in a large-scale shipyard in Manaus, Amazonas (Brazil). The central problem stems from discrepancies in the specification of material requisitions and production orders, which result in the improper allocation of these materials in the company's manufacturing yard. Exposed to Amazonian rains and weather, these materials suffer severe corrosion and become unusable when returned to the warehouse. Furthermore, the company's 60-day limit for returns induces ad-hoc system reincorporation through the artifice of "other entries," generating ghost inventories and breaking accounting traceability. Qualitative and exploratory research based on a case study was adopted, featuring direct on-site observation, semi-structured interviews with employees from the warehouse and PPCC (Production Planning and Control) departments, and process modeling using quality tools. To identify root causes, the Ishikawa Diagram and the 5 Whys technique were applied, highlighting the absence of technical quarantine, the lack of protocols for leftovers resulting from engineering changes, and the shortage of standardized inspection procedures. As an intervention proposal, the future-state modeling (TO-BE) was developed, structured in a 5W2H action plan and the drafting of a Standard Operating Procedure (SOP), establishing the reduction of the return window to up to 72 hours, the blocking of ad-hoc "other entries" adjustments in the ERP, and the mandatory segregation of returns pending Quality approval. Finally, a performance indicator (KPI) dashboard was formulated aimed at guaranteeing accuracy above 95%, ensuring the financial traceability of construction costs and the preservation of manufacturing assets.

Revista fisio&terapia.Vol. 30(164)
Faculdade Metropolitana de Manaus (BR), Universidade Federal do Amazonas (BR)
Industry, innovation and infrastructure, Responsible consumption and production
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon