Development and field application of 10 m ultra-large mining-height technologies for ultra-thick coal seam extraction

Abstract Ultra-thick coal seams are an important resource for high-production underground mining in China, yet single-pass extraction of seams exceeding 10 m in thickness presents unprecedented challenges in strata control, equipment capacity, and intelligent coordination. Targeting the geological conditions of the Caojiatan Coal Mine, this study investigates the key technologies and equipment required for the world’s first 10 m ultra-large mining-height fully mechanized working face. A coordinated strata control strategy integrating strong proactive support and protection with regional hydraulic fracturing (HF) destressing was established. Ultra-high-capacity hydraulic supports with a working resistance of 29,000 kN were developed, featuring a "double telescopic canopy beam + three-level coal-wall protection" structure for stabilizing the ultra-high coal wall. A 5 m³/min high-flow underground HF system was designed to weaken and destress thick hard roof strata, reducing cantilever development and mitigating strong mine pressure. A complete set of mining equipment—including a high-power shearer, heavy-duty armored face conveyor, and intelligent cluster-control system—was developed and integrated for the 10 m mining-height application. Field implementation demonstrated significant improvements in mine pressure behavior: initial weighting intervals decreased from > 150 m to 49.3 m, periodic weighting intervals remained below 25 m, and dynamic loading coefficients were substantially reduced. The working face achieved a maximum daily production of 71,800 tonnes, a monthly production of 1.55 million tonnes, and a recovery rate exceeding 95%, leading to considerable economic benefits and enhanced resource recovery. The successful deployment of these technologies establishes a technical pathway for safe, efficient, and intelligent extraction of ultra-thick coal seams and advances the development of next-generation high-end mining equipment for ultra-large mining-height conditions.

Authors

Institutions

Publication Details

Journal
GeoEnergy Communications
Published
2026-11-12
DOI
https://doi.org/10.1007/s44421-026-00027-4
Primary Topic
Geomechanics and Mining Engineering
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Development and field application of 10 m ultra-large mining-height technologies for ultra-thick coal seam extraction

Jinhu Zhang, Fuqiang Gao, Zhizeng HUANG, Hongpu KANG et al.
GeoEnergy Communications
Geomechanics and Mining Engineering
article

Development and field application of 10 m ultra-large mining-height technologies for ultra-thick coal seam extraction

Jinhu Zhang, Fuqiang Gao, Zhizeng HUANG, Hongpu KANG, Gang Xu, Yanjun Feng
article en

Abstract

Abstract Ultra-thick coal seams are an important resource for high-production underground mining in China, yet single-pass extraction of seams exceeding 10 m in thickness presents unprecedented challenges in strata control, equipment capacity, and intelligent coordination. Targeting the geological conditions of the Caojiatan Coal Mine, this study investigates the key technologies and equipment required for the world’s first 10 m ultra-large mining-height fully mechanized working face. A coordinated strata control strategy integrating strong proactive support and protection with regional hydraulic fracturing (HF) destressing was established. Ultra-high-capacity hydraulic supports with a working resistance of 29,000 kN were developed, featuring a "double telescopic canopy beam + three-level coal-wall protection" structure for stabilizing the ultra-high coal wall. A 5 m³/min high-flow underground HF system was designed to weaken and destress thick hard roof strata, reducing cantilever development and mitigating strong mine pressure. A complete set of mining equipment—including a high-power shearer, heavy-duty armored face conveyor, and intelligent cluster-control system—was developed and integrated for the 10 m mining-height application. Field implementation demonstrated significant improvements in mine pressure behavior: initial weighting intervals decreased from > 150 m to 49.3 m, periodic weighting intervals remained below 25 m, and dynamic loading coefficients were substantially reduced. The working face achieved a maximum daily production of 71,800 tonnes, a monthly production of 1.55 million tonnes, and a recovery rate exceeding 95%, leading to considerable economic benefits and enhanced resource recovery. The successful deployment of these technologies establishes a technical pathway for safe, efficient, and intelligent extraction of ultra-thick coal seams and advances the development of next-generation high-end mining equipment for ultra-large mining-height conditions.

GeoEnergy CommunicationsVol. 2(1)
China Coal Technology and Engineering Group Corp (China) (CN)
National Natural Science Foundation of China
Industry, innovation and infrastructure
Geomechanics and Mining Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon