Pallet-Layer Batching to Reduce Changeover Losses on a High-Mix Polyvinyl Chloride Fittings Packing Line: A Replenishment-Band Rule and Simulation Study
In polyvinyl chloride (PVC) pipe-fittings manufacturing, and similar high-mix, make-to-stock industries, packing lines often run under minimum–maximum (min–max) control. The production batch of each stock-keeping unit (SKU) is set implicitly by the difference between its maximum level and its reorder point. Set without reference to the unit load, these replenishment bands are often a fraction of a pallet, which multiplies changeovers. This study formalizes a pallet-layer batching (PLB) rule that rounds each band to a whole-layer unit load under a changeover-frequency ceiling (t) and re-sets the control levels under a safety-stock retention floor (f). Master data for the 304 SKUs of a packing line in a PVC pipe-fittings plant with more than 6,000 SKUs were evaluated by finite-capacity Monte Carlo simulation against the existing levels, manual layer rounding, the economic order quantity, a monthly fixed cycle and a cost-optimal menu selection. The existing levels committed 70% of scheduled time to changeovers. PLB (t = 1.5, f = 0.7) reduced changeover time to 55 h per month (12.8% of scheduled time), 63% below manual layer rounding, with a 100% fill rate, 2.1% more inventory and a total changeover and holding cost within 1.5% of the cost-optimal policy, without requiring cost data.
Authors
- L. Ramesh (ORCID: https://orcid.org/0000-0003-1411-1994)
Publication Details
- Journal
- Universal Library of Innovative Research and Studies
- Published
- 2026-11-12
- DOI
- https://doi.org/10.70315/uloap.ulirs.2026.0304006
- Primary Topic
- Supply Chain and Inventory Management
- Type
- article
- Field-Weighted Citation Impact
- 0.00