Optimization of initiation sequence and delay times for metro‑tunnel blasting balancing gas pipeline safety and blasting performance

To address the challenge of controlling blast-induced vibration near gas pipelines in urban underground excavations, this study takes the B-entrance of Shanshi East Road Station on Jinan Metro Line 4 as the engineering background. Through field monitoring, numerical simulation and engineering application, the joint optimization of the dynamic response of gas pipelines and rock fragmentation is investigated under three initiation Sequences—simultaneous dual-hole blasting, lateral sequential blasting and longitudinal sequential blasting and under inter-hole delay times of 5, 10, 15 and 20 ms with longitudinal sequential blasting. The results show that longitudinal sequential blasting is the optimal scheme: it reduces the peak surface vibration velocity by about 38.5% compared with simultaneous dual-hole blasting while achieving better rock fragmentation. The inter-hole delay of 5 ms is optimal, yielding the minimum von Mises stress and resultant velocity of 1.25 MPa and 1.62 cm/s, respectively, with the most ideal rock fragmentation. This scheme reduces the pipeline dynamic response while improving blasting performance, providing a reference for similar sensitive environments.

Authors

Institutions

Publication Details

Journal
Scientific Reports
Published
2026-11-12
DOI
https://doi.org/10.1038/s41598-026-77020-8
Primary Topic
Blasting Impact and Analysis
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Optimization of initiation sequence and delay times for metro‑tunnel blasting balancing gas pipeline safety and blasting performance

Jianlei Liu, 梁龙, Chenglin Tian, LI Xuewen et al.
Scientific Reports
Blasting Impact and Analysis
article

Optimization of initiation sequence and delay times for metro‑tunnel blasting balancing gas pipeline safety and blasting performance

Jianlei Liu, 梁龙, Chenglin Tian, LI Xuewen, Zhonghui Li, Jiali Liu, Yong Sun, Zhonglei Liu
article en

Abstract

To address the challenge of controlling blast-induced vibration near gas pipelines in urban underground excavations, this study takes the B-entrance of Shanshi East Road Station on Jinan Metro Line 4 as the engineering background. Through field monitoring, numerical simulation and engineering application, the joint optimization of the dynamic response of gas pipelines and rock fragmentation is investigated under three initiation Sequences—simultaneous dual-hole blasting, lateral sequential blasting and longitudinal sequential blasting and under inter-hole delay times of 5, 10, 15 and 20 ms with longitudinal sequential blasting. The results show that longitudinal sequential blasting is the optimal scheme: it reduces the peak surface vibration velocity by about 38.5% compared with simultaneous dual-hole blasting while achieving better rock fragmentation. The inter-hole delay of 5 ms is optimal, yielding the minimum von Mises stress and resultant velocity of 1.25 MPa and 1.62 cm/s, respectively, with the most ideal rock fragmentation. This scheme reduces the pipeline dynamic response while improving blasting performance, providing a reference for similar sensitive environments.

Scientific Reports
China Railway Group (China) (CN), Shandong University of Science and Technology (CN)
Chengdu Science and Technology Program
Industry, innovation and infrastructure
Blasting Impact and Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon