Design Blueprint: Error Budget for Chronometric Levelling Across a 1000 Kilometre Fibre Clock Network

Design blueprint derived from the source paper (DOI 10.5281/zenodo.24155005): A continental fibre network does not fail because its clocks are insufficient; it fails, if it does, in the accumulation of small link terms and in correlated environmental terms that do not average down with segment count. This study builds a segment-by-segment budget for a thousand-kilometre chain. The design question is concrete: with ten repeater segments, two endpoint clocks and a stated tide-model term, what height uncertainty survives, and which term should money be spent reducing first? The computed results, taken from the deposited script, are as follows in summary: The computed segme Status: DESIGN BLUEPRINT — SIMULATED, NOT MEASURED — NOT BUILT. All numbers are simulated values from the source paper's computation, deposited with this blueprint as compute.py and results.json. AI-use disclosure: Dave, an AI research system, assisted with the computation and drafting under the author's direction; author of record William Alexander Aldred.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-12
DOI
https://doi.org/10.5281/zenodo.24155576
Primary Topic
Advanced Frequency and Time Standards
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

Design Blueprint: Error Budget for Chronometric Levelling Across a 1000 Kilometre Fibre Clock Network

William Alexander Aldred
Zenodo (CERN European Organization for Nuclear Research)
Advanced Frequency and Time Standards
preprint

Design Blueprint: Error Budget for Chronometric Levelling Across a 1000 Kilometre Fibre Clock Network

William Alexander Aldred
preprint en

Abstract

Design blueprint derived from the source paper (DOI 10.5281/zenodo.24155005): A continental fibre network does not fail because its clocks are insufficient; it fails, if it does, in the accumulation of small link terms and in correlated environmental terms that do not average down with segment count. This study builds a segment-by-segment budget for a thousand-kilometre chain. The design question is concrete: with ten repeater segments, two endpoint clocks and a stated tide-model term, what height uncertainty survives, and which term should money be spent reducing first? The computed results, taken from the deposited script, are as follows in summary: The computed segme Status: DESIGN BLUEPRINT — SIMULATED, NOT MEASURED — NOT BUILT. All numbers are simulated values from the source paper's computation, deposited with this blueprint as compute.py and results.json. AI-use disclosure: Dave, an AI research system, assisted with the computation and drafting under the author's direction; author of record William Alexander Aldred.

Zenodo (CERN European Organization for Nuclear Research)
Industry, innovation and infrastructure
Advanced Frequency and Time Standards
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon