Impact of Building Information Modelling on Construction Project Management: Evidence from a Mixed-Methods Survey of Professionals in Lagos State, Nigeria

Building Information Modelling (BIM) is widely promoted as a means of improving construction project management, yet little is known about how professionals in Lagos State, Nigeria, assess its effect across several management dimensions at once. This study examined professionals’ assessments of the influence of BIM on project delivery time, cost management, quality management, and stakeholder communication and collaboration, and of the challenges constraining BIM adoption and utilisation. A mixed-methods design combined a structured five-point Likert questionnaire with 20 semi-structured interviews. All 176 BIM-experienced professionals in the purposively identified accessible population were targeted, and 160 valid questionnaires (90.9%) were analysed using descriptive statistics, Relative Importance Index (RII) and one-sample t-tests against the neutral midpoint; interviews were analysed thematically. Respondents rated BIM significantly above neutral on quality management (M = 4.144), communication and collaboration (M = 4.118), delivery time (M = 4.077) and cost management (M = 3.990), all p < .001. Within every dimension, planning- and design-stage benefits, such as early detection of design errors, activity sequencing and quantity take-off, were rated higher than final-outcome benefits, such as quality of completed work, reduction of completion delays and overall financial performance. Interviewees explained that BIM strengthens visibility and control but cannot offset funding, approval, market and supervision constraints. Shortage of skilled professionals (RII = 0.816) and the cost of software and hardware (RII = 0.811) were the leading barriers. The findings indicate that BIM’s perceived value in Lagos lies chiefly in preventive information management, and that realising it depends on competence, investment and institutional support. The perception-based, cross-sectional design limits causal inference.

Authors

Institutions

Publication Details

Journal
Iconic Research and Engineering Journals
Published
2026-11-12
DOI
https://doi.org/10.64388/ire1725066
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Impact of Building Information Modelling on Construction Project Management: Evidence from a Mixed-Methods Survey of Professionals in Lagos State, Nigeria

Akinwale Oladotun Coker, Olusegun O. Olatunji
1 links
Iconic Research and Engineering Journals
BIM and Construction Integration
article

Impact of Building Information Modelling on Construction Project Management: Evidence from a Mixed-Methods Survey of Professionals in Lagos State, Nigeria

Akinwale Oladotun Coker, Olusegun O. Olatunji
article en

Abstract

Building Information Modelling (BIM) is widely promoted as a means of improving construction project management, yet little is known about how professionals in Lagos State, Nigeria, assess its effect across several management dimensions at once. This study examined professionals’ assessments of the influence of BIM on project delivery time, cost management, quality management, and stakeholder communication and collaboration, and of the challenges constraining BIM adoption and utilisation. A mixed-methods design combined a structured five-point Likert questionnaire with 20 semi-structured interviews. All 176 BIM-experienced professionals in the purposively identified accessible population were targeted, and 160 valid questionnaires (90.9%) were analysed using descriptive statistics, Relative Importance Index (RII) and one-sample t-tests against the neutral midpoint; interviews were analysed thematically. Respondents rated BIM significantly above neutral on quality management (M = 4.144), communication and collaboration (M = 4.118), delivery time (M = 4.077) and cost management (M = 3.990), all p < .001. Within every dimension, planning- and design-stage benefits, such as early detection of design errors, activity sequencing and quantity take-off, were rated higher than final-outcome benefits, such as quality of completed work, reduction of completion delays and overall financial performance. Interviewees explained that BIM strengthens visibility and control but cannot offset funding, approval, market and supervision constraints. Shortage of skilled professionals (RII = 0.816) and the cost of software and hardware (RII = 0.811) were the leading barriers. The findings indicate that BIM’s perceived value in Lagos lies chiefly in preventive information management, and that realising it depends on competence, investment and institutional support. The perception-based, cross-sectional design limits causal inference.

Iconic Research and Engineering JournalsVol. 10(5)
University of Ibadan (NG)
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon