Detecting Millimetre-Per-Year Subsidence With a Repeated Clock Network: Required Campaign Cadence
Subsidence and uplift move a station through the potential at millimetres per year. A clock network revisited on a campaign cadence sees that motion as a trend, and the useful design question is how long a trend takes to stand out from campaign noise. This paper computes detection times for three vertical rates under annual and quarterly campaigns, using a standard trend-uncertainty scaling stated in the Methods, and compares the cadence benefit with its cost in repeated transport and link work. The computed results, taken from the deposited script, are as follows in summary: The computed rows entry 1 rate_mm_yr is 1. The computed rows entry 1 cadence is annual. The computed rows entry 1 years_to_3sigma is 10. The computed rows entry 2 rate_mm_yr is 1. The computed rows entry 2 cadence is quarterly. The computed rows entry 2 years_to_3sigma is 6.5. The computed rows entry 3 rate_mm_yr is 3. The computed rows entry 3 cadence is annual. The computed rows entry 3 years_to_3sigma is 5. The computed rows entry 4 rate_mm_yr is 3. The computed rows entry 4 cadence is quarterly. The computed rows entry 4 years_to_3sigma is 3.5. The computed rows entry 5 rate_mm_yr is 10. The computed rows entry 5 cadence is annual. The study is a computation from stated assumptions, not a measurement, and its figures should be read at the precision those assumptions support.
Authors
- William Alexander Aldred (ORCID: https://orcid.org/0009-0000-1215-577X)
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-12
- DOI
- https://doi.org/10.5281/zenodo.24155238
- Primary Topic
- Advanced Frequency and Time Standards
- Type
- article
- Field-Weighted Citation Impact
- 0.00