Calculating Nomograms of Efficiency of Measures Performed in Distribution Network Sections
The article presents the methods of assessing effi ciency of repair and investment costs in a distribution network based on the adaptive reliability model of networks with backbone topology. It provides calculated dependencies of performance indicators on key parameters and variables, the criterion for assessing the economic feasibility of costs, which is determined by reliability indicators and equipment costs, taking into account ongoing works, the load of main sections, the magnitude of specifi c damages to consumers, and per- missible payback periods for measures performed. Performance indicators for costs in a network with variable lengths of main lines and total loads, taking into account the simple reliability indicators and the cost of elements, have been calculated. Calculation nomo- grams for the effi ciency of measures and their pools in sections with diff erent load densities have been plotted, and the analysis of their eco- nomic feasibility with consideration of specifi c damages to consumers and payback periods for investments has been performed.
Authors
- Ilgiz Fanzilevich Galiev
- Ramil I. Galiev
- Marsel Rinatovich Garifullin (ORCID: https://orcid.org/0000-0001-6744-9249)
- Shamil R. Yakhin (ORCID: https://orcid.org/0009-0003-6584-8619)
- A Khaertdinova
Institutions
- Kazan State Power Engineering University (RU)
Publication Details
- Journal
- Electric Power Transmission and Distribution
- Published
- 2026-11-12
- DOI
- https://doi.org/10.65209/2218-3116-2026-6-99-64-75
- Primary Topic
- Power System Reliability and Maintenance
- Type
- article
- Field-Weighted Citation Impact
- 0.00