Design Blueprint: A Sodium-Sulphur Molten-Electrode Store at a Distribution Substation: Ceramic Electrolyte Area, Operating Heat and Thermal Standby Loss for Four Hundred Usable Kilowatt-Hours

Design blueprint derived from the source paper (DOI 10.5281/zenodo.24174103): This paper sizes a sodium-sulphur storage system for a distribution substation requiring load levelling through the evening peak. The duty calls for 400 usable electrical kilowatt-hours delivered at a rated power of 100 kilowatts. Working from a stated specific energy of 110 watt-hours per kilogram, an energy density of 180 watt-hours per litre, a usable depth-of-discharge fraction of 0.9, and a round-trip efficiency of 85 percent, the calculation gives a gross stored energy of 444 kilowatt-hours, an active-store mass of 4.04e+03 kilograms, a complete system mass of 5.86e+03 kilograms, and a complete system volume of 3.58e+03 litres (3.58 cubic metres). Full discharge at rated power lasts 4 hours, and a full recharge takes 4.82 hours at the stated charge power. Losses amount to 72.3 kilowatt-hours per complete cycle, appearing as heat at average rates of 7.5 kilowatts during charging and 9.04 kilowatts during discharge. Standing loss is 0.05 percent of the stored energy per day. Life is limited by the cycle limit, giving 4.5e+03 effective full cycles, about 15 years at the assumed cycling rate, and a lifetime delivered throughput of 1.8e+03 megawatt-hours. All values are computed from the stated assumptions; the system is a design study and has not been built or measured. Status: SIMULATED, NOT MEASURED. Status: DESIGN BLUEPRINT — SIMULATED, NOT MEASURED — NOT BUILT. All numbers are simulated values from the source paper's computation, deposited with this blueprint as compute.py and results.json. AI-use disclosure: Dave, an AI research system, assisted with the computation and drafting under the author's direction; author of record William Alexander Aldred.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-12
DOI
https://doi.org/10.5281/zenodo.24175464
Primary Topic
Power Systems and Renewable Energy
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

Design Blueprint: A Sodium-Sulphur Molten-Electrode Store at a Distribution Substation: Ceramic Electrolyte Area, Operating Heat and Thermal Standby Loss for Four Hundred Usable Kilowatt-Hours

William Alexander Aldred
Zenodo (CERN European Organization for Nuclear Research)
Power Systems and Renewable Energy
preprint

Design Blueprint: A Sodium-Sulphur Molten-Electrode Store at a Distribution Substation: Ceramic Electrolyte Area, Operating Heat and Thermal Standby Loss for Four Hundred Usable Kilowatt-Hours

William Alexander Aldred
preprint en

Abstract

Design blueprint derived from the source paper (DOI 10.5281/zenodo.24174103): This paper sizes a sodium-sulphur storage system for a distribution substation requiring load levelling through the evening peak. The duty calls for 400 usable electrical kilowatt-hours delivered at a rated power of 100 kilowatts. Working from a stated specific energy of 110 watt-hours per kilogram, an energy density of 180 watt-hours per litre, a usable depth-of-discharge fraction of 0.9, and a round-trip efficiency of 85 percent, the calculation gives a gross stored energy of 444 kilowatt-hours, an active-store mass of 4.04e+03 kilograms, a complete system mass of 5.86e+03 kilograms, and a complete system volume of 3.58e+03 litres (3.58 cubic metres). Full discharge at rated power lasts 4 hours, and a full recharge takes 4.82 hours at the stated charge power. Losses amount to 72.3 kilowatt-hours per complete cycle, appearing as heat at average rates of 7.5 kilowatts during charging and 9.04 kilowatts during discharge. Standing loss is 0.05 percent of the stored energy per day. Life is limited by the cycle limit, giving 4.5e+03 effective full cycles, about 15 years at the assumed cycling rate, and a lifetime delivered throughput of 1.8e+03 megawatt-hours. All values are computed from the stated assumptions; the system is a design study and has not been built or measured. Status: SIMULATED, NOT MEASURED. Status: DESIGN BLUEPRINT — SIMULATED, NOT MEASURED — NOT BUILT. All numbers are simulated values from the source paper's computation, deposited with this blueprint as compute.py and results.json. AI-use disclosure: Dave, an AI research system, assisted with the computation and drafting under the author's direction; author of record William Alexander Aldred.

Zenodo (CERN European Organization for Nuclear Research)
Affordable and clean energy, Industry, innovation and infrastructure
Power Systems and Renewable Energy
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon