A BIM-based multi-objective optimization decision-making method for green retrofit of existing public buildings

Introduction To address conflicting objectives, unclear life-cycle boundaries, and the difficulty of translating optimization outputs into implementation priorities in the retrofit of existing public buildings, this study proposes a BIM-driven multi-objective decision process. The contribution does not arise from the individual use of BIM, NSGA-II, or TOPSIS, which are established tools; rather, it lies in linking BIM-derived parameters, multi-domain performance analyses, life-cycle energy-economic-carbon objectives, Pareto screening, TOPSIS ranking, and engineering-oriented retrofit prioritization within a traceable building-level decision chain. Methods Annual comprehensive energy consumption, life-cycle cost, and life-cycle carbon emissions within the defined retrofit boundary are minimized, while code compliance, daylighting, and ventilation performance are treated as feasibility checks. The framework is demonstrated using an existing scientific research laboratory building. Results Under the original modeling assumptions, the compromise solution yields a calculated 26.7% reduction in annual comprehensive energy consumption, annual operating-cost savings of approximately CNY 0.8 million, a simple payback period of 6.25 years, and a net annual carbon reduction of approximately 850 t CO 2 , while satisfying the GB 50189–2015 benchmark adopted in the original case evaluation. A three-dimensional priority matrix of energy-saving contribution, investment intensity, and construction disturbance is further used to translate the mathematical solution into engineering decision information. Discussion The reported outcomes support comparative decision-making under consistent assumptions and should not be interpreted as a substitute for long-term measured post-retrofit performance.

Authors

Institutions

Publication Details

Journal
Frontiers in Built Environment
Published
2026-11-11
DOI
https://doi.org/10.3389/fbuil.2026.1941332
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

A BIM-based multi-objective optimization decision-making method for green retrofit of existing public buildings

Xiaoyun Peng, Xinyan Wang
Frontiers in Built Environment
BIM and Construction Integration
article

A BIM-based multi-objective optimization decision-making method for green retrofit of existing public buildings

Xiaoyun Peng, Xinyan Wang
article en

Abstract

Introduction To address conflicting objectives, unclear life-cycle boundaries, and the difficulty of translating optimization outputs into implementation priorities in the retrofit of existing public buildings, this study proposes a BIM-driven multi-objective decision process. The contribution does not arise from the individual use of BIM, NSGA-II, or TOPSIS, which are established tools; rather, it lies in linking BIM-derived parameters, multi-domain performance analyses, life-cycle energy-economic-carbon objectives, Pareto screening, TOPSIS ranking, and engineering-oriented retrofit prioritization within a traceable building-level decision chain. Methods Annual comprehensive energy consumption, life-cycle cost, and life-cycle carbon emissions within the defined retrofit boundary are minimized, while code compliance, daylighting, and ventilation performance are treated as feasibility checks. The framework is demonstrated using an existing scientific research laboratory building. Results Under the original modeling assumptions, the compromise solution yields a calculated 26.7% reduction in annual comprehensive energy consumption, annual operating-cost savings of approximately CNY 0.8 million, a simple payback period of 6.25 years, and a net annual carbon reduction of approximately 850 t CO 2 , while satisfying the GB 50189–2015 benchmark adopted in the original case evaluation. A three-dimensional priority matrix of energy-saving contribution, investment intensity, and construction disturbance is further used to translate the mathematical solution into engineering decision information. Discussion The reported outcomes support comparative decision-making under consistent assumptions and should not be interpreted as a substitute for long-term measured post-retrofit performance.

Frontiers in Built EnvironmentVol. 12
East China Jiaotong University (CN)
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon