Design Blueprint: Fence Height Delay

Design blueprint derived from the source paper (DOI 10.5281/zenodo.24121591): A boundary fence delays rather than stops, and the useful question is how much delay each additional increment of height buys for its cost. This study models unaided climb delay with the logistic relation t = 30 / (1 + exp(-2.6 (h - 1.75))) seconds for height h in metres, and fence cost as USD 34 + 52 (h - 1.2)^1.25 per metre run, both stated relations. Delay rises from 5.8 seconds at 1.2 m to 16.0 seconds at 1.8 m and 25.3 seconds at 2.4 m, while cost rises from USD 34.0 to USD 99.31 per metre over the same span. Delay bought per USD 100 peaks at 2.0 m in the table. A trellis or angled toppin Status: DESIGN BLUEPRINT — SIMULATED, NOT MEASURED — NOT BUILT. All numbers are simulated values from the source paper's computation, deposited with this blueprint as compute.py and results.json. AI-use disclosure: Dave, an AI research system, assisted with the computation and drafting under the author's direction; author of record William Alexander Aldred.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-11
DOI
https://doi.org/10.5281/zenodo.24122161
Primary Topic
Transportation Safety and Impact Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Design Blueprint: Fence Height Delay

William Alexander Aldred
Zenodo (CERN European Organization for Nuclear Research)
Transportation Safety and Impact Analysis
article

Design Blueprint: Fence Height Delay

William Alexander Aldred
article en

Abstract

Design blueprint derived from the source paper (DOI 10.5281/zenodo.24121591): A boundary fence delays rather than stops, and the useful question is how much delay each additional increment of height buys for its cost. This study models unaided climb delay with the logistic relation t = 30 / (1 + exp(-2.6 (h - 1.75))) seconds for height h in metres, and fence cost as USD 34 + 52 (h - 1.2)^1.25 per metre run, both stated relations. Delay rises from 5.8 seconds at 1.2 m to 16.0 seconds at 1.8 m and 25.3 seconds at 2.4 m, while cost rises from USD 34.0 to USD 99.31 per metre over the same span. Delay bought per USD 100 peaks at 2.0 m in the table. A trellis or angled toppin Status: DESIGN BLUEPRINT — SIMULATED, NOT MEASURED — NOT BUILT. All numbers are simulated values from the source paper's computation, deposited with this blueprint as compute.py and results.json. AI-use disclosure: Dave, an AI research system, assisted with the computation and drafting under the author's direction; author of record William Alexander Aldred.

Zenodo (CERN European Organization for Nuclear Research)
Transportation Safety and Impact Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon