O paradoxo do empenho impulsivo em obras públicas: o planejamento deficitário e a urgência do "banco de projetos" sob a égide da Lei nº 14.133/2021

Deficit planning in the preparatory phase of public bidding is one of the critical factors for the failure and stoppage of engineering works in Brazil, generating extensive time and cost distortions in the executive phase. According to article 6, item XXV, of Law No. 14,133/2021, the basic design must present a set of precise and sufficient elements to characterize and size the enterprise. However, the persistence of weak preliminary studies and imprecise specifications negatively impacts the development of descriptive memorials, forcing informal and improvised decision-making at the construction site or resulting in the abandonment of the bidding process by the contractors. From the perspective of building diagnostics engineering, it is estimated that poorly designed projects originate about 18% of the pathological manifestations in buildings, showing that the physical conservation of public assets is inseparable from rigid planning guidelines. This study analyzes the relevance of prior administrative and technical planning as a mechanism of budgetary governance and prevention against building degradation in the public sector. Methodologically, an applied research with a qualitative approach is adopted, developed through bibliographic and documentary review. As solution vectors, we propose the structuring of Project Management Offices (PMO) and the adoption of Building Information Modeling (BIM) focused on predictive maintenance and Facility Management (BIM 7D), optimizing efficiency and economy throughout the life cycle of public buildings.

Authors

Publication Details

Journal
Revista fisio&terapia.
Published
2026-11-11
DOI
https://doi.org/10.69849/f07tyy77
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

O paradoxo do empenho impulsivo em obras públicas: o planejamento deficitário e a urgência do "banco de projetos" sob a égide da Lei nº 14.133/2021

Matheus Barbosa Martins, Milenne Alves Ferreira, Carla Zanine Arantes, Wendel Serqueira Rocha
Revista fisio&terapia.
Construction Project Management and Performance
article

O paradoxo do empenho impulsivo em obras públicas: o planejamento deficitário e a urgência do "banco de projetos" sob a égide da Lei nº 14.133/2021

Matheus Barbosa Martins, Milenne Alves Ferreira, Carla Zanine Arantes, Wendel Serqueira Rocha
article en

Abstract

Deficit planning in the preparatory phase of public bidding is one of the critical factors for the failure and stoppage of engineering works in Brazil, generating extensive time and cost distortions in the executive phase. According to article 6, item XXV, of Law No. 14,133/2021, the basic design must present a set of precise and sufficient elements to characterize and size the enterprise. However, the persistence of weak preliminary studies and imprecise specifications negatively impacts the development of descriptive memorials, forcing informal and improvised decision-making at the construction site or resulting in the abandonment of the bidding process by the contractors. From the perspective of building diagnostics engineering, it is estimated that poorly designed projects originate about 18% of the pathological manifestations in buildings, showing that the physical conservation of public assets is inseparable from rigid planning guidelines. This study analyzes the relevance of prior administrative and technical planning as a mechanism of budgetary governance and prevention against building degradation in the public sector. Methodologically, an applied research with a qualitative approach is adopted, developed through bibliographic and documentary review. As solution vectors, we propose the structuring of Project Management Offices (PMO) and the adoption of Building Information Modeling (BIM) focused on predictive maintenance and Facility Management (BIM 7D), optimizing efficiency and economy throughout the life cycle of public buildings.

Revista fisio&terapia.Vol. 30(164)
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon