Calcium-Rich Lithium Brines of the Maricunga Salar, Chile: Resource Potential, Processing Challenges and Future Sustainable Projects

Chilean lithium production depends on the Atacama Salar, and the Atacama Region is the main option for diversifying it. Published geological, hydrogeological, geochemical, technological and institutional information on the Maricunga Salar is integrated here; most project-scale data derive from one NI 43-101 technical report. Brine chemistry determines how lithium can be processed, and reservoir properties determine how much brine can be extracted. Maricunga brines average 1122 mg/L Li (range 460 to 3375 mg/L; n = 718), with a mean total dissolved solids content of 311 g/L, Mg/Li of 6.53 (equal to that of Atacama), Ca/Li of 11.45 and SO4/Li of 0.63, and, with Tres Quebradas (Argentina), define the calcium-rich endmember of the Andean brines compiled. Pitzer calculations place the mean brine at gypsum saturation, and simulated evaporation removes only about 1% of the calcium, so calcium must be removed chemically in addition to magnesium (2.2 t Ca and 1.2 t Mg per tonne of lithium carbonate equivalent, LCE). In the reservoir, drainable porosity ranges from 0.02 in the lacustrine clays separating the shallow and deep aquifers to 0.14 in marginal alluvial deposits, and the coarse units holding most drainable brine are the least sampled. Resource estimates evaluated different areas and depths and are not directly comparable: 224,300 t Li in 1982 (0 to 30 m) and 358,000 t Li in 2021 (0 to 400 m, 953 mg/L). Announced projects total 75,000 t LCE/year in their initial stages. The main constraints are hydrogeological and institutional: unresolved connectivity with Laguna Santa Rosa and the Paipote ravine, unpublished hydraulic conductivity and piezometric data, and undemonstrated calcium removal and spent-brine reinjection at industrial scale.

Authors

Institutions

Publication Details

Journal
Minerals
Published
2026-11-11
DOI
https://doi.org/10.3390/min16111178
Primary Topic
Extraction and Separation Processes
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Calcium-Rich Lithium Brines of the Maricunga Salar, Chile: Resource Potential, Processing Challenges and Future Sustainable Projects

Norman Toro, Jonathan Castillo, Alexis Guzmán, Williams H. Leiva et al.
Minerals
Extraction and Separation Processes
article

Calcium-Rich Lithium Brines of the Maricunga Salar, Chile: Resource Potential, Processing Challenges and Future Sustainable Projects

Norman Toro, Jonathan Castillo, Alexis Guzmán, Williams H. Leiva, ERIKA MEZA, Edelmira D. Gálvez, Rossana Sepúlveda, Javiera Vera
article en

Abstract

Chilean lithium production depends on the Atacama Salar, and the Atacama Region is the main option for diversifying it. Published geological, hydrogeological, geochemical, technological and institutional information on the Maricunga Salar is integrated here; most project-scale data derive from one NI 43-101 technical report. Brine chemistry determines how lithium can be processed, and reservoir properties determine how much brine can be extracted. Maricunga brines average 1122 mg/L Li (range 460 to 3375 mg/L; n = 718), with a mean total dissolved solids content of 311 g/L, Mg/Li of 6.53 (equal to that of Atacama), Ca/Li of 11.45 and SO4/Li of 0.63, and, with Tres Quebradas (Argentina), define the calcium-rich endmember of the Andean brines compiled. Pitzer calculations place the mean brine at gypsum saturation, and simulated evaporation removes only about 1% of the calcium, so calcium must be removed chemically in addition to magnesium (2.2 t Ca and 1.2 t Mg per tonne of lithium carbonate equivalent, LCE). In the reservoir, drainable porosity ranges from 0.02 in the lacustrine clays separating the shallow and deep aquifers to 0.14 in marginal alluvial deposits, and the coarse units holding most drainable brine are the least sampled. Resource estimates evaluated different areas and depths and are not directly comparable: 224,300 t Li in 1982 (0 to 30 m) and 358,000 t Li in 2021 (0 to 400 m, 953 mg/L). Announced projects total 75,000 t LCE/year in their initial stages. The main constraints are hydrogeological and institutional: unresolved connectivity with Laguna Santa Rosa and the Paipote ravine, unpublished hydraulic conductivity and piezometric data, and undemonstrated calcium removal and spent-brine reinjection at industrial scale.

MineralsVol. 16(11)
University of Atacama (CL), Universidad Católica del Norte (CL), Universidad San Sebastián (CL), Arturo Prat University (CL)
Extraction and Separation Processes
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon