A Fifth-Coordinate Timing Beacon: Clock Synchronisation Across a Transit Link and Its Error Budget

This paper presents a complete design study of the device is a timing beacon pair, one at each end of an Earth-Moon baseline, exchanging pulses through a fifth-coordinate transit path and disciplining two atomic clocks to a common epoch, derived from stated assumptions and computed throughout by the accompanying script. At transit parameter 1.0 the one-way signal time over the Earth-Moon baseline is 1.6836 s. The assembled error budget gives a total root-mean-square timing error of 1021.03 ps, equivalent to a ranging uncertainty of 306.1 mm, dominated by the stated path jitter term. Every figure in the study is a computed result of the stated model and nothing was built or tested: the study is SIMULATED, NOT MEASURED, and its limits are stated as plainly as its performance.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-11
DOI
https://doi.org/10.5281/zenodo.24123453
Citations
1
Primary Topic
Advanced Frequency and Time Standards
Type
article
Field-Weighted Citation Impact
1.20
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

A Fifth-Coordinate Timing Beacon: Clock Synchronisation Across a Transit Link and Its Error Budget

William Alexander Aldred
1 citations
Zenodo (CERN European Organization for Nuclear Research)
Advanced Frequency and Time Standards
1.20
article

A Fifth-Coordinate Timing Beacon: Clock Synchronisation Across a Transit Link and Its Error Budget

William Alexander Aldred
article en
1 citations

Abstract

This paper presents a complete design study of the device is a timing beacon pair, one at each end of an Earth-Moon baseline, exchanging pulses through a fifth-coordinate transit path and disciplining two atomic clocks to a common epoch, derived from stated assumptions and computed throughout by the accompanying script. At transit parameter 1.0 the one-way signal time over the Earth-Moon baseline is 1.6836 s. The assembled error budget gives a total root-mean-square timing error of 1021.03 ps, equivalent to a ranging uncertainty of 306.1 mm, dominated by the stated path jitter term. Every figure in the study is a computed result of the stated model and nothing was built or tested: the study is SIMULATED, NOT MEASURED, and its limits are stated as plainly as its performance.

Zenodo (CERN European Organization for Nuclear Research)
Openalex Percentile: Top 29%
Advanced Frequency and Time Standards
1.20
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon