Evaluating Preliminary Estimation Bias and Operational Delays in Indian Public Procurement: Evidence from Infrastructure Projects and Alignment with SDGs

This study examines the empirical nexus between early-stage budgeting bias, post-award contract execution timelines, and macroeconomic sustainability within India’s premier construction agency, the Central Public Works Department (CPWD). Moving away from subjective stakeholder surveys, this paper uses an unaggregated, project-specific baseline built from two large-scale historical datasets (n = 994 for planning; n = 861 for execution). A parametric paired t-test confirms a systemic pre-award overestimation trend (t (993) = 14.83, p < .001), with baseline preliminary estimates exceeding final expenditures by an average of ₹1,319.98 lakhs. This practice creates an artificial capital lock-up that directly undermines SDG 9. Conversely, multiple linear regression reveals that post-award schedule delays exhibit a minor but statistically significant negative partial correlation with cost overruns (β = -.09, p = .012), supporting the budgetary cushion hypothesis. Prolonged project standstills do not drive linear cost growth; instead, they cause execution halts that freeze expenditures while causing severe environmental degradation, raw material waste, and compromises on green design standards (SDG 12, SDG 13). Ultimately, this paper outlines data-driven validation filters, such as Reference Class Forecasting, to mitigate artificial resource tie-ups and optimize public funds for sustainable infrastructure networks.

Authors

Publication Details

Journal
International Journal of Civil Engineering
Published
2026-11-11
DOI
https://doi.org/10.14445/23488352/ijce-v13i10p105
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Evaluating Preliminary Estimation Bias and Operational Delays in Indian Public Procurement: Evidence from Infrastructure Projects and Alignment with SDGs

Srikonda Ramesh, Papolu Pramod, Kranti Kumar Myneni, Faiz Ahmed Chundeli
International Journal of Civil Engineering
Construction Project Management and Performance
article

Evaluating Preliminary Estimation Bias and Operational Delays in Indian Public Procurement: Evidence from Infrastructure Projects and Alignment with SDGs

Srikonda Ramesh, Papolu Pramod, Kranti Kumar Myneni, Faiz Ahmed Chundeli
article en

Abstract

This study examines the empirical nexus between early-stage budgeting bias, post-award contract execution timelines, and macroeconomic sustainability within India’s premier construction agency, the Central Public Works Department (CPWD). Moving away from subjective stakeholder surveys, this paper uses an unaggregated, project-specific baseline built from two large-scale historical datasets (n = 994 for planning; n = 861 for execution). A parametric paired t-test confirms a systemic pre-award overestimation trend (t (993) = 14.83, p < .001), with baseline preliminary estimates exceeding final expenditures by an average of ₹1,319.98 lakhs. This practice creates an artificial capital lock-up that directly undermines SDG 9. Conversely, multiple linear regression reveals that post-award schedule delays exhibit a minor but statistically significant negative partial correlation with cost overruns (β = -.09, p = .012), supporting the budgetary cushion hypothesis. Prolonged project standstills do not drive linear cost growth; instead, they cause execution halts that freeze expenditures while causing severe environmental degradation, raw material waste, and compromises on green design standards (SDG 12, SDG 13). Ultimately, this paper outlines data-driven validation filters, such as Reference Class Forecasting, to mitigate artificial resource tie-ups and optimize public funds for sustainable infrastructure networks.

International Journal of Civil EngineeringVol. 13(10)
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon