Front End Engineering Design Maturity and Investment Decision Quality in Public Infrastructure

Front end engineering design (FEED) establishes the technical and commercial evidence on which capital investment decisions depend, yet its maturity is frequently treated as equivalent to document completion. This state-of-the-art review examines how FEED maturity, accuracy and quality relate to final investment decision (FID) effectiveness and public infrastructure performance, with particular attention to Uganda. A critical narrative synthesis was developed a targeted verification of peer reviewed research, Construction Industry Institute resources and Ugandan public investment sources. The evidence distinguishes deliverable development from confidence in its underlying assumptions, and identifies investment governance as the mechanism through which front end information can influence execution. Industrial project studies associate stronger FEED with improved cost performance, but their observational designs and potentially overlapping samples limit causal and cross sector inference. Infrastructure definition tools, project validation, external benchmarking and sustainability assessment provide complementary decision support. The review identifies unresolved problems in measuring FID effectiveness, transferring industrial instruments to public infrastructure, separating readiness from organizational capacity and assessing long term public value. An integrated framework is proposed that combines sector specific scope definition, independent assurance, stakeholder and safeguard readiness, affordability and documented approval conditions. It treats governance and external uncertainty as contextual influences and includes feedback from operations into future project preparation. The framework is a research proposition rather than an empirically validated Ugandan model. Longitudinal project records and independently verified baselines are needed to test its explanatory value and calibrate approval thresholds.

Authors

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-10
DOI
https://doi.org/10.5281/zenodo.24104182
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Front End Engineering Design Maturity and Investment Decision Quality in Public Infrastructure

Naturinda Dans, Ssemwogerere Kenneth, Mugumya Peter
Zenodo (CERN European Organization for Nuclear Research)
Construction Project Management and Performance
article

Front End Engineering Design Maturity and Investment Decision Quality in Public Infrastructure

Naturinda Dans, Ssemwogerere Kenneth, Mugumya Peter
article en

Abstract

Front end engineering design (FEED) establishes the technical and commercial evidence on which capital investment decisions depend, yet its maturity is frequently treated as equivalent to document completion. This state-of-the-art review examines how FEED maturity, accuracy and quality relate to final investment decision (FID) effectiveness and public infrastructure performance, with particular attention to Uganda. A critical narrative synthesis was developed a targeted verification of peer reviewed research, Construction Industry Institute resources and Ugandan public investment sources. The evidence distinguishes deliverable development from confidence in its underlying assumptions, and identifies investment governance as the mechanism through which front end information can influence execution. Industrial project studies associate stronger FEED with improved cost performance, but their observational designs and potentially overlapping samples limit causal and cross sector inference. Infrastructure definition tools, project validation, external benchmarking and sustainability assessment provide complementary decision support. The review identifies unresolved problems in measuring FID effectiveness, transferring industrial instruments to public infrastructure, separating readiness from organizational capacity and assessing long term public value. An integrated framework is proposed that combines sector specific scope definition, independent assurance, stakeholder and safeguard readiness, affordability and documented approval conditions. It treats governance and external uncertainty as contextual influences and includes feedback from operations into future project preparation. The framework is a research proposition rather than an empirically validated Ugandan model. Longitudinal project records and independently verified baselines are needed to test its explanatory value and calibrate approval thresholds.

Zenodo (CERN European Organization for Nuclear Research)
Makerere University (UG)
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
Front End Engineering Design Maturity and Investment Decision Quality in Public Infrastructure — Naturinda Dans, Ssemwogerere Kenneth, et al. · Zenodo (CERN European Organization for Nuclear Research) (2026) | TGRS Research Map | TGRS