The Charcoal Budget of a Small Forge: Fuel per Hardening, the Temperature a Bed and Blast Can Hold, and the Combinations That Never Reach Hardening Heat

A small charcoal forge is usually described by anecdote: a bed of a certain size, a blower turned up until the colour looks right, and a bag of charcoal that lasts an uncertain number of blades. This paper replaces the anecdote with an energy balance. For a 0.25 kg steel blade that must reach 850 °C, the blade itself needs only 121.2 kJ, yet a working forge delivers that energy at an efficiency of 0.49 % on a cold start and 3.26 % per repeat blade in the reference case, because nearly all of the heat leaves with the flue gas and by radiation from the open bed. Across 72 combinations of bed diameter (0.20–0.45 m) and blast rate (2–30 L/s), 47 reach the 850 °C target, 6 reach only the 800 °C minimum, and 19 never reach hardening temperature at all, however long they burn. Whether a combination works is governed by one quantity: blast per unit bed area. Every failing combination sits at or below a superficial air velocity of 0.057 m/s, and every combination that reaches the target sits at or above 0.075 m/s, which gives a practical sizing rule of at least 85 litres of air per second per square metre of bed. In the reference case (0.30 m bed, 10 L/s) the bed holds 1111 °C, the workpiece 969 °C, heat-up from cold takes 9.8 minutes, and one hardening costs 0.855 kg of charcoal (1.03 US dollars in bulk, 2.57 dollars at retail bag prices), while each further blade from the hot bed costs 0.128 kg. The most expensive working combination, a 0.45 m bed at its minimum working blast of 12 L/s, costs 1.883 kg per first hardening. A large bed on a weak blast is the worst purchase of all: a 0.45 m bed at 8 L/s burns 3.56 kg of charcoal per hour at a heat release of 24.40 kW and still leaves the workpiece at 778 °C, below hardening temperature.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-10
DOI
https://doi.org/10.5281/zenodo.24114087
Primary Topic
Iron and Steelmaking Processes
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

The Charcoal Budget of a Small Forge: Fuel per Hardening, the Temperature a Bed and Blast Can Hold, and the Combinations That Never Reach Hardening Heat

William Alexander Aldred
Zenodo (CERN European Organization for Nuclear Research)
Iron and Steelmaking Processes
article

The Charcoal Budget of a Small Forge: Fuel per Hardening, the Temperature a Bed and Blast Can Hold, and the Combinations That Never Reach Hardening Heat

William Alexander Aldred
article en

Abstract

A small charcoal forge is usually described by anecdote: a bed of a certain size, a blower turned up until the colour looks right, and a bag of charcoal that lasts an uncertain number of blades. This paper replaces the anecdote with an energy balance. For a 0.25 kg steel blade that must reach 850 °C, the blade itself needs only 121.2 kJ, yet a working forge delivers that energy at an efficiency of 0.49 % on a cold start and 3.26 % per repeat blade in the reference case, because nearly all of the heat leaves with the flue gas and by radiation from the open bed. Across 72 combinations of bed diameter (0.20–0.45 m) and blast rate (2–30 L/s), 47 reach the 850 °C target, 6 reach only the 800 °C minimum, and 19 never reach hardening temperature at all, however long they burn. Whether a combination works is governed by one quantity: blast per unit bed area. Every failing combination sits at or below a superficial air velocity of 0.057 m/s, and every combination that reaches the target sits at or above 0.075 m/s, which gives a practical sizing rule of at least 85 litres of air per second per square metre of bed. In the reference case (0.30 m bed, 10 L/s) the bed holds 1111 °C, the workpiece 969 °C, heat-up from cold takes 9.8 minutes, and one hardening costs 0.855 kg of charcoal (1.03 US dollars in bulk, 2.57 dollars at retail bag prices), while each further blade from the hot bed costs 0.128 kg. The most expensive working combination, a 0.45 m bed at its minimum working blast of 12 L/s, costs 1.883 kg per first hardening. A large bed on a weak blast is the worst purchase of all: a 0.45 m bed at 8 L/s burns 3.56 kg of charcoal per hour at a heat release of 24.40 kW and still leaves the workpiece at 778 °C, below hardening temperature.

Zenodo (CERN European Organization for Nuclear Research)
Iron and Steelmaking Processes
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon