Pico-Hydro Power Without a Dam: A Run-of-Stream Design for a 45-Household Hill Village, Sized to Its Dry Season
A complete dam-free run-of-stream pico-hydro design for a stated reference stream (35 m gross head, 78-260 L/s monthly flows) serving 45 households. The turbine is sized to the dry season: dry-season minimum output is 12.35 kW continuous (281.7 kWh/day in the driest month), 1.73 times village demand, at a levelised cost of $0.060 per kWh served versus $0.42 for solar plus battery delivering the same continuous service. Includes penstock sizing, costs, failure conditions, and a one-visit site specification. Simulated, not measured.
Authors
- William Alexander Aldred
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-10
- DOI
- https://doi.org/10.5281/zenodo.24109104
- Primary Topic
- Renewable energy and sustainable power systems
- Type
- preprint