2026 workplace EV retrofit: Level 2 load-sharing planning target vs DC expansion
Plan $3,200 per port for networked Level 2 EV charging with load-sharing in 2026; add DC expansion only if queues exceed one vehicle per port. Independent technical note mirroring the canonical version: https://vuti.app/blog/2026-workplace-ev-retrofit-level-2-load-sharing-planning-target-vs-dc-expansion.php
Authors
- Lars Bergstrom
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-09
- DOI
- https://doi.org/10.5281/zenodo.24079195
- Primary Topic
- Electric Vehicles and Infrastructure
- Type
- preprint