Analysis of the effectiveness of BIM technologies in the construction of buildings, bridges, and highways

Purpose. The objective is to investigate whether the use of BIM modeling in bridge construction in Ukraine meets the actual needs of the bridge life cycle. Methodology. A comparative analysis of the effectiveness of BIM technologies in industrial and civil engineering, bridge construction, and road construction was conducted, taking into account the specific characteristics of the structures, the complexity of design solutions, the need for coordination, the automation of work volume estimation, and the provision of information for operation. Findings. It has been established that BIM is most effective during the design of complex structures with a large number of interrelated elements. For industrial and civil construction, the main advantage is the coordination of structural and engineering systems; for bridges, it is the modeling of complex geometry, structural elements, and the sequence of work; and for highways, it is the integration of design solutions with data on topography, alignment, and earthwork. At the same time, it has been demonstrated that the need for BIM modeling is not fixed and depends on the type of project and the primary objective: ensuring the quality of design solutions, coordinating project participants, digitizing project documentation, or providing information support for the project throughout its life cycle. Originality. The scientific novelty of this study lies in the systematization of criteria for assessing the feasibility of BIM technologies for various types of construction projects. The paper justifies the need for a differentiated approach to BIM, in which the level of model detail, the composition of information data, and the depth of digitization are determined not only by the type of structure but also by its structural complexity, the scale of work, the number of interrelated elements, and the requirements for subsequent operation. Practical value. The practical significance of this study lies in developing an approach to selecting the optimal level of BIM implementation depending on the type of facility, its life cycle stage, and specific engineering tasks.

Authors

Institutions

Publication Details

Journal
Bridges and tunnels Theory Research Practice
Published
2026-11-09
DOI
https://doi.org/10.15802/bttrp2026-30-08
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Analysis of the effectiveness of BIM technologies in the construction of buildings, bridges, and highways

Sergii Aksonov, Anna Miniukova, Bolislav Vyshnivskyi, Oleksandr Melnychenko
Bridges and tunnels Theory Research Practice
BIM and Construction Integration
article

Analysis of the effectiveness of BIM technologies in the construction of buildings, bridges, and highways

Sergii Aksonov, Anna Miniukova, Bolislav Vyshnivskyi, Oleksandr Melnychenko
article en

Abstract

Purpose. The objective is to investigate whether the use of BIM modeling in bridge construction in Ukraine meets the actual needs of the bridge life cycle. Methodology. A comparative analysis of the effectiveness of BIM technologies in industrial and civil engineering, bridge construction, and road construction was conducted, taking into account the specific characteristics of the structures, the complexity of design solutions, the need for coordination, the automation of work volume estimation, and the provision of information for operation. Findings. It has been established that BIM is most effective during the design of complex structures with a large number of interrelated elements. For industrial and civil construction, the main advantage is the coordination of structural and engineering systems; for bridges, it is the modeling of complex geometry, structural elements, and the sequence of work; and for highways, it is the integration of design solutions with data on topography, alignment, and earthwork. At the same time, it has been demonstrated that the need for BIM modeling is not fixed and depends on the type of project and the primary objective: ensuring the quality of design solutions, coordinating project participants, digitizing project documentation, or providing information support for the project throughout its life cycle. Originality. The scientific novelty of this study lies in the systematization of criteria for assessing the feasibility of BIM technologies for various types of construction projects. The paper justifies the need for a differentiated approach to BIM, in which the level of model detail, the composition of information data, and the depth of digitization are determined not only by the type of structure but also by its structural complexity, the scale of work, the number of interrelated elements, and the requirements for subsequent operation. Practical value. The practical significance of this study lies in developing an approach to selecting the optimal level of BIM implementation depending on the type of facility, its life cycle stage, and specific engineering tasks.

Bridges and tunnels Theory Research Practice(30)
National Transport University (UA)
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon