Costs and benefits of digital twin adoption in UK construction: a statistically tested stakeholder perception study

Purpose There is limited quantitative data on the weighting of costs and benefits of digital twin (DT) for stakeholders in the UK and this paper re-tests sub-group differences from a 2022 survey. Design/methodology/approach The 74 members of DTHub rated 15 benefits and 10 costs (scale of 0–4) and ranked both by Relative Importance Index (RII) (full sample) as well as two experience-based sub-samples (Group A n = 17; Group B n = 57). Corrected Mann-Whitney U and Kruskal-Wallis H tests were used to explore differences and Spearman correlations were used for rank agreement. Findings Operational benefits (Lean Construction, Effective Data Sharing, Improved Decision Making, Construction 4.0) topped net-zero and United Nations (UN) Sustainable Development Goal (SDG) benefits. Artificial Intelligence (AI) Components, Skilled Personnel and IoT Devices/Systems were the top-rated costs. There were no significant differences between sub-groups after correction (groups shared similar priorities of benefits, but not costs). Research limitations/implications Due to the small, self-selected sample (n = 74; Group A n = 17), this limits the power of the study and null results are not confirmatory. Larger replication (mixed methods) across contexts is recommended. Practical implications Operational benefits should be the main consideration for a new DT framework. For the dominant costs, coordinated investments between industry, government and education in AI, skills and IoT are needed; for the environmental-perception gap, evidence, not communication is needed. Originality/value One of the first construction DT RII studies to formally test differences in sub-group rank with dual correction, providing a tested baseline for research following Centre for Digital Built Britain and a transferable example of RII research.

Authors

Institutions

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2026-11-09
DOI
https://doi.org/10.1108/ecam-06-2026-1309
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Costs and benefits of digital twin adoption in UK construction: a statistically tested stakeholder perception study

Mohiminul Islam Fardin
Engineering Construction & Architectural Management
BIM and Construction Integration
article

Costs and benefits of digital twin adoption in UK construction: a statistically tested stakeholder perception study

Mohiminul Islam Fardin
article en

Abstract

Purpose There is limited quantitative data on the weighting of costs and benefits of digital twin (DT) for stakeholders in the UK and this paper re-tests sub-group differences from a 2022 survey. Design/methodology/approach The 74 members of DTHub rated 15 benefits and 10 costs (scale of 0–4) and ranked both by Relative Importance Index (RII) (full sample) as well as two experience-based sub-samples (Group A n = 17; Group B n = 57). Corrected Mann-Whitney U and Kruskal-Wallis H tests were used to explore differences and Spearman correlations were used for rank agreement. Findings Operational benefits (Lean Construction, Effective Data Sharing, Improved Decision Making, Construction 4.0) topped net-zero and United Nations (UN) Sustainable Development Goal (SDG) benefits. Artificial Intelligence (AI) Components, Skilled Personnel and IoT Devices/Systems were the top-rated costs. There were no significant differences between sub-groups after correction (groups shared similar priorities of benefits, but not costs). Research limitations/implications Due to the small, self-selected sample (n = 74; Group A n = 17), this limits the power of the study and null results are not confirmatory. Larger replication (mixed methods) across contexts is recommended. Practical implications Operational benefits should be the main consideration for a new DT framework. For the dominant costs, coordinated investments between industry, government and education in AI, skills and IoT are needed; for the environmental-perception gap, evidence, not communication is needed. Originality/value One of the first construction DT RII studies to formally test differences in sub-group rank with dual correction, providing a tested baseline for research following Centre for Digital Built Britain and a transferable example of RII research.

Engineering Construction & Architectural Management
London South Bank University (GB)
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon